My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-038
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 3:34:05 PM
Creation date
9/30/2015 8:12:49 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/07/2006
Control Number
2006-038
Agenda Item Number
11.C.2.
Entity Name
Peter R. Brown Construction, Inc.
Subject
jail expansion project amendment one, reduces beds
Area
Indian River County jail
Supplemental fields
SmeadsoftID
4471
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peter <br /> YG'C :N !i F1ROtfV C9:VLi1:tl iCYl04, !NC. <br /> Indian River County Jail Expansion 2005 <br /> Initial GMP Submittal <br /> Option 3 - Site Work , 256 - Bed Housing and Phase II Buildings <br /> January 30 , 2006 <br /> 11B Medical Equipment <br /> 11 B - 1 . Medical equipment is not included as Infirmary building is not included in Option <br /> 3 . <br /> 11 C Laundry Equipment <br /> 11 C - 1 . Laundry equipment is not included ; Alternate 13 includes the additional cost for <br /> the laundry equipment . <br /> 11D Athletic Equipment <br /> 11 D- 1 . (4 ) Wall mounted basketball hoops with 2 ' extender arm and aluminum fan <br /> boards are included . <br /> 11E Food Service Equipment <br /> 11 E - 1 . Food service equipment indicated in room 133 ( Southeast Housing Dorm ) is not <br /> included . All other food service equipment is included as indicated on sheets <br /> FS1 . 17 FS1 . 2 , FS1 . 3 and FS1 . 4 <br /> 15A Fire Sprinkler System <br /> 15A- 1 . Fire sprinkler system is not shown or included in the attic spaces ( i . e . D/A3 . 2 ) . <br /> 15B Plumbing <br /> 1513 - 1 . No clarifications at this time . <br /> 15C HVAC Systems <br /> 15C - 1 . An allowance of $ 35 , 000 is included for Material Testing and Balancing for the <br /> HVAC system as listed in the List of Allowances section of this document . <br /> 16A Electrical Systems <br /> 16A- 1 . Lightning protection indicated on sheets LP0 . 1 and LP0 . 2 ( phase II ) is excluded <br /> per Indian River County ' s request . <br /> List of Alternates <br /> Cost information for these Alternates is detailed in the Exhibit E section of this document <br /> Alternates that were accepted by Indian River County and are included in this GMP are : <br /> Alternate 7 , 81 91 10 , 11 , 13 , 14 , 15 , 16 , 17 and 19 <br /> ➢ Alt 7 — Delete Concrete at Electrical Duct Bank <br /> Concrete encasement for electrical duct bank <br /> ➢ Alt 8 — Delete Walkway Extensions from Buildings to North and South Service Drive <br /> Canopy and fencing are not included as indicated on sheet A1 . 0 . <br /> The section of the service road running between the south portion of the SE and SW <br /> Housing Dorms is included as asphalt as indicated on sheet C1 . 5 dated 12/20/05 in lieu <br /> of as indicated on sheets Al . 1 , A1 . 21 A1 . 3 and Al A <br /> Page 9 of 11 <br /> M : ACurrent Projects\Indian River Jail Expansion\Dormitory & Infirmary 112205\Clarifications\Clarifications 122105 JS . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.