Laserfiche WebLink
Peter <br /> Yli t'::Il i F.f.0\4 Y I:OV:SI HOCpn . per <br /> Indian River County Jail Expansion 2005 <br /> Initial GMP Submittal <br /> Option 3 - Site Work , 256 - 13ed Housing and Phase II Buildings <br /> January 30 , 2006 <br /> Alternate for north service drive is no longer valid as NE Housing Dorm has been <br /> deleted from the scope of work . <br /> ➢ Alt 9 — Delete 128 Bed Housing Unit and Queuing Area from Scope of Work <br /> Credit for work is reflected in new base price per Option 3 <br /> Building pad to be seeded . <br /> Water/fire service " T" is included at location of future building construction . <br /> ➢ Alt 10 — Delete Final Cleaning from Scope of Work <br /> Final cleaning for 256- bed SE and SW Housing Dorms , Intake/ Release , Sallyport , <br /> Maintenance Building , Kitchen/Connector and Warehouse/Visitation will be performed by <br /> inmates <br /> ➢ Alt 11 — Delete Fencinq at Canopy from Scope of Work <br /> Fencing for 9 , 554 sqft of walkway canopy remaining in Scope of Work <br /> ➢ Alt 13 — Delete Laundry Equipment from Scope of Work <br /> Washers and dryers for 256- bed Housing Dorm <br /> ➢ Alt 14 — Delete Tack boards & Lockers back to the Scope of Work <br /> Cost for tack boards in 256- bed SE and SW Housing Dorms . <br /> Alternate for lockers are no longer valid as Infirmary has been deleted from the Scope of <br /> Work . <br /> ➢ Alt 15 — Combine Water/Fire Service to Buildings <br /> 8- inch water main to make 90 degree turn and include 8- inch BFP/ RPZ and 4 - inch <br /> meter . 8- inch DDCVA and dedicated fire line to be deleted . Fire lines to be tapped at <br /> east side of site for each building and include a DDCVA at each tap location for a total of <br /> two ( 2 ) . Taps of fire main for future buildings will not include DDCVA , only caps at the <br /> end of the piping . <br /> ➢ Alt 16 — Relocate Sanitary Sewer Station 12 + 50 to 16 + 20 <br /> Existing manhole inverts to be modified to flow to the south to new manholes . New <br /> manholes to be set in grassed area south of the roadway to reduce the amount of <br /> demolition and repair to the existing roadway . <br /> ➢ Alt 17 — Re- Route Duct bank <br /> Costs including Electrical , Detention wiring , demo and repair of existing parking area to <br /> accommodate new duct bank route . <br /> ➢ Alt 19 — Tilt Wall Exterior Wall System <br /> Wall Type 4 changed to tilt- up concrete in lieu of precast . Costs for Structural Analysis , <br /> Engineering or other System Engineering or Designs are not included <br /> Page 10 of 11 <br /> M : ACurrent Proiects\Indian River Jail Expansion\Dormitory & Infirmary 112205\Clarifications\Clarifications 122105 JS . doc <br />