My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-038
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 3:34:05 PM
Creation date
9/30/2015 8:12:49 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/07/2006
Control Number
2006-038
Agenda Item Number
11.C.2.
Entity Name
Peter R. Brown Construction, Inc.
Subject
jail expansion project amendment one, reduces beds
Area
Indian River County jail
Supplemental fields
SmeadsoftID
4471
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peter <br /> Yli t'::Il i F.f.0\4 Y I:OV:SI HOCpn . per <br /> Indian River County Jail Expansion 2005 <br /> Initial GMP Submittal <br /> Option 3 - Site Work , 256 - 13ed Housing and Phase II Buildings <br /> January 30 , 2006 <br /> Alternate for north service drive is no longer valid as NE Housing Dorm has been <br /> deleted from the scope of work . <br /> ➢ Alt 9 — Delete 128 Bed Housing Unit and Queuing Area from Scope of Work <br /> Credit for work is reflected in new base price per Option 3 <br /> Building pad to be seeded . <br /> Water/fire service " T" is included at location of future building construction . <br /> ➢ Alt 10 — Delete Final Cleaning from Scope of Work <br /> Final cleaning for 256- bed SE and SW Housing Dorms , Intake/ Release , Sallyport , <br /> Maintenance Building , Kitchen/Connector and Warehouse/Visitation will be performed by <br /> inmates <br /> ➢ Alt 11 — Delete Fencinq at Canopy from Scope of Work <br /> Fencing for 9 , 554 sqft of walkway canopy remaining in Scope of Work <br /> ➢ Alt 13 — Delete Laundry Equipment from Scope of Work <br /> Washers and dryers for 256- bed Housing Dorm <br /> ➢ Alt 14 — Delete Tack boards & Lockers back to the Scope of Work <br /> Cost for tack boards in 256- bed SE and SW Housing Dorms . <br /> Alternate for lockers are no longer valid as Infirmary has been deleted from the Scope of <br /> Work . <br /> ➢ Alt 15 — Combine Water/Fire Service to Buildings <br /> 8- inch water main to make 90 degree turn and include 8- inch BFP/ RPZ and 4 - inch <br /> meter . 8- inch DDCVA and dedicated fire line to be deleted . Fire lines to be tapped at <br /> east side of site for each building and include a DDCVA at each tap location for a total of <br /> two ( 2 ) . Taps of fire main for future buildings will not include DDCVA , only caps at the <br /> end of the piping . <br /> ➢ Alt 16 — Relocate Sanitary Sewer Station 12 + 50 to 16 + 20 <br /> Existing manhole inverts to be modified to flow to the south to new manholes . New <br /> manholes to be set in grassed area south of the roadway to reduce the amount of <br /> demolition and repair to the existing roadway . <br /> ➢ Alt 17 — Re- Route Duct bank <br /> Costs including Electrical , Detention wiring , demo and repair of existing parking area to <br /> accommodate new duct bank route . <br /> ➢ Alt 19 — Tilt Wall Exterior Wall System <br /> Wall Type 4 changed to tilt- up concrete in lieu of precast . Costs for Structural Analysis , <br /> Engineering or other System Engineering or Designs are not included <br /> Page 10 of 11 <br /> M : ACurrent Proiects\Indian River Jail Expansion\Dormitory & Infirmary 112205\Clarifications\Clarifications 122105 JS . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.