My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-139
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2016 11:28:41 AM
Creation date
10/1/2015 3:34:13 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br /> SCOPE OF SERVICES <br /> Jones ' s Pier <br /> • An interpretation of the soil and ground water quality data collected from <br /> the Site . <br /> • Maps depicting the location of soil borings and monitoring wells . <br /> • Ground water contour maps . <br /> • Iso - concentration maps . <br /> • Copies of the laboratory data sheets . <br /> • Copies of the field sampling logs . <br /> • Monitoring well construction logs . <br /> The proposed remedial action for the Site will be based upon the nature and <br /> extent of contamination identified in the soil and ground water during the site <br /> assessment . However, it is assumed that the County will be amenable to the use <br /> Of institutional controls ( restrictive covenants ) to limit the use of the property and <br /> preclude exposure to the contamination . Therefore , the RAP will outline <br /> procedures for meeting the requirements of RMO Level Il , <br /> The Combined Document will be prepared in accordance with Chapter 62- <br /> 780 . 600 ( 8 ) , FAC and will be signed and sealed by a Professional Geologist <br /> licensed in the State of Florida . A draft copy of the Combined Document will be <br /> provided to the County for review . KHA will prepare a total of 4 final copies of <br /> the Combined Document . Two signed copies will be submitted to the FDEP and <br /> two copies will be provided to the County . <br /> Task 4 — Remedial Action Plan lmplenientation <br /> Without the benefit of an FDEP - approved SAR, it is difficult to prescribe a <br /> remedial strategy for the Site . However, based on our knowledge of the current <br /> site conditions and our understanding of Chapter 62 - 780 , FAC , the on - site soils <br /> appear to meet the requirements for Risk Management Option ( RMO ) Level I — <br /> No Further Action without Conditions . Similarly , the localized ground water <br /> appears to meets the requirements for RMO Level 11 — No Further Action with <br /> Conditions . Ultimately , the FDEP must approve the remedial strategies prior to <br /> their implementation . Therefore , KHA has prescribed the following remedial <br /> strategy for the Site based on approved RAPS for similar sites . <br /> Based on our experience with similar sites , the remedial strategy for the Site will <br /> include the collection of quarterly ground water quality data from the five <br /> existing and three proposed monitoring wells on the Site . The purpose of the <br /> ground water monitoring is to demonstrate that the contaminant plume is ( 1 ) less <br /> than '/4 - acre in size ; (2 ) not increasing in concentration ; and ( 3 ) not migrating <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.