Task 1 . MCC-2, ATS, and VFD Replacement and Upgrades (.Yew Task) <br /> The existing MCC-2 and ATS at the South RO plant are in need of replacement since they are <br /> more than 25 years old, there are no available replacement components for this equipment, and <br /> corrosion of some of the bus bars may lead to its sudden failure. All of the high service pumps <br /> are fed off of this MCC, so it is a critical item that needs immediate attention. The feedwater <br /> pump VFD ' s (2) are also outdated and in need of replaceable parts which are currently obsolete <br /> and require special fabrication. <br /> The approach is to develop a phasing plan which allows for the demolition and replacement of the <br /> existing MCC to occur with minimal downtime to the existing switchgear. This plan will also <br /> include the transitioning of the existing high service pumps from the existing starters to the <br /> proposed variable frequency drives with limited loss of pumping capacity during this transition. <br /> Consultant will develop a plan, review with IRCU staff, and incorporate into a <br /> Since the plant was first commissioned in 1983 it has gone through several expansions and <br /> modifications including electrical room equipment. Currently, there is no current updated set of <br /> electrical single-line diagrams that describes the entire plant ' s power distribution system. <br /> Consultant will prepare a new updated single-line diagram to describe each of the four MCC ' s, <br /> the connected equipment to each, the existing switch gear, available spares in the MCC ' s and <br /> switch gear and rated current loads . <br /> Consultant will prepare construction documents that will consist of plans and specifications that <br /> will detail the replacement of existing MCC-2, ATS, and feedwater pump VFD ' s, including <br /> development of a sequence of construction that will maintain high service pump operations and <br /> minimize impacts to major treatment components . Some of the existing ancillary equipment can <br /> be phased without interruption or eliminated based on it no longer being in use. <br /> In order to provide improved reliability, some of the critical electrical loads should be shared <br /> between differenct MCC ' s. All of the existing high service pumps are powered off of the one <br /> MCC-2 . Consultant will evaluate splitting some of the electrical loads to another MCC, such as <br /> MCC- 1 or MCC-3 . Consultant will design alternate means of powering the new high service <br /> pumps off of alternate MCC ' s . <br /> Consultant will conduct field investigations to review the accuracy of existing record drawings <br /> and to identify equipment ratings and associated connections for the design of MCC -2 <br /> replacement. <br /> Consultant will prepare up to 15 drawings of the MCC replacement and minor modifications to <br /> the existing electrical room to accommodate the new MCC. Consultant will prepare technical <br /> specifications for the MCC replacement and include these in with the bid documents. <br /> A 90% review set of drawings will be submitted to Owner for review and anticipate a one week <br /> turn around for review time. <br /> Consultant will provide IRC purchasing department 2 hard copies and electronic copies of the <br /> drawings and technical specifications . <br /> Task 2 — Modify Drawings and Specifications for RO Train Improvements (Amended) <br /> S .'•.044\044572017-SRO Upgrades%Scope\South RO Plant MCC Replacement - Amendment 2 rev 5.doc Page 2 <br />