My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-044
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:50:39 AM
Creation date
9/30/2015 11:58:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/05/2008
Control Number
2008-044
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates
Subject
Amendment No.2 to Work Order No.14 Services Agreement
Supplemental fields
SmeadsoftID
6865
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1. MCC -2, ATS, and VFD Replacement and Upgrades (.Yew Task) <br />The existing MCC -2 and ATS at the South RO plant are in need of replacement since they are <br />more than 25 years old, there are no available replacement components for this equipment, and <br />corrosion of some of the bus bars may lead to its sudden failure. All of the high service pumps <br />are fed off of this MCC, so it is a critical item that needs immediate attention. The feedwater <br />pump VFD's (2) are also outdated and in need of replaceable parts which are currently obsolete <br />and require special fabrication. <br />The approach is to develop a phasing plan which allows for the demolition and replacement of the <br />existing MCC to occur with minimal downtime to the existing switchgear. This plan will also <br />include the transitioning of the existing high service pumps from the existing starters to the <br />proposed variable frequency drives with limited loss of pumping capacity during this transition. <br />Consultant will develop a plan, review with IRCU staff, and incorporate into a <br />Since the plant was first commissioned in 1983 it has gone through several expansions and <br />modifications including electrical room equipment. Currently, there is no current updated set of <br />electrical single -line diagrams that describes the entire plant's power distribution system. <br />Consultant will prepare a new updated single -line diagram to describe each of the four MCC's, <br />the connected equipment to each, the existing switch gear, available spares in the MCC's and <br />switch gear and rated current loads. <br />Consultant will prepare construction documents that will consist of plans and specifications that <br />will detail the replacement of existing MCC -2, ATS, and feedwater pump VFD's, including <br />development of a sequence of construction that will maintain high service pump operations and <br />minimize impacts to major treatment components. Some of the existing ancillary equipment can <br />be phased without interruption or eliminated based on it no longer being in use. <br />In order to provide improved reliability, some of the critical electrical loads should be shared <br />between differenct MCC's. All of the existing high service pumps are powered off of the one <br />MCC -2. Consultant will evaluate splitting some of the electrical loads to another MCC, such as <br />MCC -1 or MCC -3. Consultant will design alternate means of powering the new high service <br />pumps off of alternate MCC's. <br />Consultant will conduct field investigations to review the accuracy of existing record drawings <br />and to identify equipment ratings and associated connections for the design of MCC -2 <br />replacement. <br />Consultant will prepare up to 15 drawings of the MCC replacement and minor modifications to <br />the existing electrical room to accommodate the new MCC. Consultant will prepare technical <br />specifications for the MCC replacement and include these in with the bid documents. <br />A 90% review set of drawings will be submitted to Owner for review and anticipate a one week <br />turn around for review time. <br />Consultant will provide IRC purchasing department 2 hard copies and electronic copies of the <br />drawings and technical specifications. <br />Task 2 — Modify Drawings and Specifications for RO Train Improvements (Amended) <br />5.'•.044\044572017 -SRO Upgrades%Scope\South RO Plant MCC Replacement - Amendment 2 rev 5.doc Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.