Recent improvements to the existing RO treatment process have restored the capacity back to the <br /> original design capacity of 6 mgd. During these improvements several additional components <br /> associated with the RO treatment system were identified as needing repairs. Some of these <br /> consist of: <br /> 1 . Replace all polypropylene sample tubes and associated fittings from the pressure vessel <br /> to the sample panel . Install new pressure vessel nameplates and confirm that the pressure <br /> vessel number corresponds to the sample panel valve number. <br /> 2 . Construct new 6 inch PVC permeate collection headers with new 1 - 1 /4" permeate hoses <br /> and associated fittings and clamps. <br /> 3 . Include a line item in the bid form for an allocation of ten each victaulics and <br /> replacement ports. <br /> Consultant will prepare construction notes for these improvements to be included with the <br /> existing set of drawings. <br /> Task 3 — Services During Construction (Amended) <br /> Additional construction phase services for this work will need to cover seven months of activity, <br /> of which was assumed to be concurrent with TLC ' s work. However, since TLC is now <br /> completed with the phase I of work on membrane replacement, additional field observation and <br /> services during construction will be required. <br /> The Consultant will provide construction phase services for this project, consisting of shop <br /> drawing review, meeting attendance, field observation, start up assistance, preparation of record <br /> drawings, and final certification of completion of the project. <br /> The Consultant will attend one ( 1 ) pre-work meeting at the project site. On-site construction <br /> observations will be provided in proportion to the level of activity with the selected contractor. <br /> Shop drawing submittals will be reviewed for conformance with the intent of the Contract <br /> Documents. Shop drawings will be submitted directly to the Consultant and reviewed submittals <br /> returned to the Contractor and Indian River County Utilities . <br /> The Consultant will coordinate and attend one ( 1 ) project status meeting per month for <br /> coordination and status updates of the project with the selected Contractor and Owner. The <br /> Consultant will provide observation of construction for the duration of the project described <br /> herein. The Consultant will also review pay requests and provide recommendations for payment <br /> to Indian River County Utilities based on progress of the work. <br /> It is anticipated that the duration of the project will be approximately nine (9) months, of which <br /> some will be idle time to order some of the long-lead time equipment. The Consultant's visits <br /> will be for the purpose of endeavoring to provide the Owner a greater degree of confidence that <br /> the completed work of its Contractors will generally conform to the construction documents <br /> prepared by the Consultant. The Consultant neither guarantees the performance of Contractors, <br /> nor assumes responsibility for any Contractor ' s failure to perform its work in accordance with the <br /> Contract Documents. Work that the Consultant believes does not comply with the Contract <br /> Documents will be brought to the attention of Indian River County Utilities and the Contractor. <br /> The Consultant shall have no responsibility for any Contractor's means, methods , techniques, <br /> equipment choice and usage, sequence, schedule, safety programs, or safety practices, nor shall <br /> the Consultant have any authority or responsibility to stop or direct the work of any Contractor. <br /> 5:`.044\044572017-SRO Upgrades\Scope\South RO Plant MCC Replacement - Amendment 2 rev 5.doc Page 3 <br />