My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-044
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:50:39 AM
Creation date
9/30/2015 11:58:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/05/2008
Control Number
2008-044
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates
Subject
Amendment No.2 to Work Order No.14 Services Agreement
Supplemental fields
SmeadsoftID
6865
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On-site construction observations will be provided in proportion to the level of activity with the <br />selected contractor. It is anticipated that on-site observations will be one day per week for the <br />first 4 months of activity, then 2 days/week during three months of heavy contractor activity. <br />A punch -list will be prepared for the items that need to be completed for final closeout of the <br />project. The Consultant will perform two site visits with the Contractor to review the status of the <br />completion of these punch -list items. <br />On-site testing of the high service pump control logic will be provided by the Contractor. <br />Consultant will observe on-site testing of the automated operation of the high service pump <br />operation following completion of construction by the contractor. <br />Through October 2007, there is $21,879 remaining in the existing work order and previous <br />amendment. For the overall duration of 9 months of construction phase, a fee of $53,200 is <br />assumed. Therefore, the additional construction phase services under this amendment is assumed <br />to be $31,321 ($531200 - $21,879). <br />Task 4. Conduct an IDSE for Final Stage 2 Disinfectants and Disinfection Byproducts Rule <br />and Conduct water quality testing (New Task) <br />The following scope is provided to develop a Standard Monitoring Plan Form 6 (see attached) for <br />IRCU water distribution system in accordance with EPA's IDSE requirements and guidance <br />manual for Final Stage 2 DBPR, January 2006, and submit to EPA (see attached requirements <br />and schedule). <br />Consultant will support IRCU staff in preparing a standard monitoring plan Form 6 and <br />submitting to EPA for their approval. The standard monitoring plan Form 6 includes: <br />• General information <br />• IDSE Requirements <br />• Selection of Standard Monitoring Sites <br />• Justification of Site Selection <br />• Peak Historical Month and monitoring schedule <br />• Planned Stage I DBPR compliance monitoring schedule <br />• Distribution system schematic <br />• Attachments <br />Consultant will fill out Section I and II of general information and the stage 2 DBPR <br />requirements with information and support furnished by IRCU staff. <br />Consultant will work with staff in selecting standard monitoring sites in accordance with section <br />III of Form 6. Consultant will review water quality data collected to date for Stage 1 and historic <br />DBP data for the last several years. Consultant will help IRCU staff in identifying the four types <br />(8 sites total required) of required standard monitoring sites, consisting of: <br />• near entry point <br />• average residence time <br />• high TTHM <br />• high HAA5 <br />S:\044''044572017 -SRO Upgrades\Scope\South RO Plant MCC Replacement - Amendment 2 rev 5. doc Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.