Consultant will review water distribution system map furnished by IRCU. Consultant will <br />modify the water system model to a presentable map to include features such as layout of pipes, <br />locations of treatment facilities, pump stations, and storage facilities, pressure zone boundaries, <br />locations of large users, and population density information. This information is assumed to be <br />available and all that is necessary is to develop the water model into a presentable map in <br />accordance with section VII. No hydraulic modeling to determine average residence time will be <br />conducted, but historical disinfectant residual data collected throughout the system will be used to <br />determine these. <br />Prepare justification and summary (Section N of Form 6) of standard monitoring sites, consisting <br />of an evaluation of system characteristics. System characteristics will be reviewed with staff and <br />consist of: <br />• pipe sizes <br />• relationship to storage facilities <br />• estimate water usage <br />• source water (2 treatment facilities) <br />• range if residual concentrations <br />• range of HPC levels, if available <br />Consultant will review peak historical month with the highest TTHM and HAAS levels, or worst <br />case month and fill out section V of Form 6. With IRCU staff, consultant will develop the <br />monitoring schedule which best fits the peak month and proposed compliance monitoring <br />schedule. <br />It is assumed that a hard copy of the Standard Monitoring Plan with attachments will be <br />submitted to EPA on IRCU's behalf. Consultant will furnish 6 copies of the plan and include an <br />electronic copy in Adobe .pdf format to IRCU. <br />SCHEDULE <br />Preparation of design and technical specification documents under Task 1 is anticipated to be <br />complete within 6 — 8 weeks of notice to proceed. The advertisement phase is dependent upon <br />Owners review and approval of the bid documents for bidding, and may be performed within 2-5 <br />weeks after the design/technical documents are prepared. Task 2 is anticipated to be <br />approximately nine (9) months after notice to proceed is issued to the qualified bidder. <br />FEES <br />We will provide these services in accordance with our Continuing Services Contract Agreement <br />for Professional Services dated April 6, 2004, amended April 7th, 2007 with Indian River County, <br />a political subdivision of the state of Florida. <br />The Consultant will provide these services for a Lump Sum fee as follows: <br />Task No. I <br />Task <br />Task Fee <br />Task I <br />MCC -2 Replacement, VFD Upgrades, <br />S 52,000 <br />hgear upgrades (C&W Engineering) <br />fy Drawings and Specifications for RO <br />$ 8,500 <br />"3Servireq <br />Improvements <br />DuringConstruction $31,321 <br />S:\044\044572017 -SRO Upgrades`•Scope\South RO Plant MCC Replacement -Amendment 2 rev 5.doc Page 5 <br />