My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-044
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2016 12:00:43 PM
Creation date
9/30/2015 11:58:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/05/2008
Control Number
2008-044
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates
Subject
Amendment No.2 to Work Order No.14 Services Agreement
Supplemental fields
SmeadsoftID
6865
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will review water distribution system map furnished by IRCU . Consultant will <br /> modify the water system model to a presentable map to include features such as layout of pipes, <br /> locations of treatment facilities, pump stations, and storage facilities, pressure zone boundaries, <br /> locations of large users, and population density information. This information is assumed to be <br /> available and all that is necessary is to develop the water model into a presentable map in <br /> accordance with section VII. No hydraulic modeling to determine average residence time will be <br /> conducted, but historical disinfectant residual data collected throughout the system will be used to <br /> determine these. <br /> Prepare justification and summary (Section N of Form 6) of standard monitoring sites, consisting <br /> of an evaluation of system characteristics . System characteristics will be reviewed with staff and <br /> consist of: <br /> • pipe sizes <br /> • relationship to storage facilities <br /> • estimate water usage <br /> • source water (2 treatment facilities) <br /> • range if residual concentrations <br /> • range of HPC levels, if available <br /> Consultant will review peak historical month with the highest TTHM and HAAS levels, or worst <br /> case month and fill out section V of Form 6 . With IRCU staff, consultant will develop the <br /> monitoring schedule which best fits the peak month and proposed compliance monitoring <br /> schedule . <br /> It is assumed that a hard copy of the Standard Monitoring Plan with attachments will be <br /> submitted to EPA on IRCU ' s behalf. Consultant will furnish 6 copies of the plan and include an <br /> electronic copy in Adobe .pdf format to IRCU. <br /> SCHEDULE <br /> Preparation of design and technical specification documents under Task 1 is anticipated to be <br /> complete within 6 — 8 weeks of notice to proceed. The advertisement phase is dependent upon <br /> Owners review and approval of the bid documents for bidding, and may be performed within 2-5 <br /> weeks after the design/technical documents are prepared. Task 2 is anticipated to be <br /> approximately nine (9) months after notice to proceed is issued to the qualified bidder. <br /> FEES <br /> We will provide these services in accordance with our Continuing Services Contract Agreement <br /> for Professional Services dated April 6, 2004, amended April 7th, 2007 with Indian River County, <br /> a political subdivision of the state of Florida. <br /> The Consultant will provide these services for a Lump Sum fee as follows : <br /> Task No. I Task Task Fee <br /> Task I MCC-2 Replacement, VFD Upgrades, S 52 ,000 <br /> "3Servireq <br /> hgear upgrades (C&W Engineering) <br /> fy Drawings and Specifications for RO <br /> Im rovements <br /> During Construction $31 ,321 <br /> S:\044\044572017-SRO Upgrades`•Scope\South RO Plant MCC Replacement - Amendment 2 rev 5 .doc Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.