Laserfiche WebLink
Task 4 Conduct IDSE Evaluation and WQ Testing $133500 <br /> Total Lump Sum Fee = $105,321 <br /> ADDITIONAL SERVICES <br /> This Scope of Services does not include the following elements for this project that may be <br /> required depending on circumstances that may arise during the execution of this project. Some <br /> elements that may be considered additional services are mentioned herein. Additional services <br /> include, but may not be limited to the following : <br /> • Bidding beyond what is described herein <br /> • Additional items added to the scope of work beyond what is listed herein and what <br /> currently exists on the previous design drawings dated Sept 2007 is not included and can <br /> be provided as additional services . <br /> S:\044\044572017-SRO Upgrades\Scope\South RO Plant MCC Replacement - Amendment 2 rev 5 .doc Page 6 <br />