Laserfiche WebLink
Task 4 <br />Conduct IDSE Evaluation and WQ Testing <br />$133500 <br />Total Lump Sum Fee = $105,321 <br />ADDITIONAL SERVICES <br />This Scope of Services does not include the following elements for this project that may be <br />required depending on circumstances that may arise during the execution of this project. Some <br />elements that may be considered additional services are mentioned herein. Additional services <br />include, but may not be limited to the following: <br />• Bidding beyond what is described herein <br />• Additional items added to the scope of work beyond what is listed herein and what <br />currently exists on the previous design drawings dated Sept 2007 is not included and can <br />be provided as additional services. <br />S:\044\044572017 -SRO Upgrades\Scope\South RO Plant MCC Replacement - Amendment 2 rev 5.doc Page 6 <br />