My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-098
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 10:03:08 AM
Creation date
10/1/2015 12:03:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
04/08/2008
Control Number
2008-098
Agenda Item Number
8.L.
Entity Name
Kimley-Horn and Associates
Subject
Amendment No.4 services agreement 66th Ave. Roadway Widening
Area
66th Avenue /CR 510
Supplemental fields
SmeadsoftID
6945
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Amendment No. 4 <br /> 66" Avenue/ County Road 510 Roadway Widening <br /> improvements at the Schumann Drive/ Barber Street intersection . Mast-arm <br /> signal configuration will be designed to meet current COUNTY and FDOT <br /> standards. <br /> H. Structure Headwall Design <br /> The ENGINEER shall prepare preliminary and final plans associated with the <br /> culvert extension and headwall replacement associated with the cross drain <br /> culvert located west of Schumann Drive under Barber Street. <br /> 1 . Culvert plans will be prepared associated with the culvert located along <br /> the east leg of Barber Street. The design and construction documents will <br /> be prepared utilizing FDOT' s LRFD Culvert Program. <br /> 2. Construction and material specifications will be based on FDOT Standard <br /> Specifications for Road and Bridge Construction, 2007 Edition. <br /> 3 . All design and plan details will be in the English unit system. <br /> " SECTION V — COMPENSATION" is being modified to incorporate the following : <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees inclusive of expenses in accordance with the following : <br /> A. Professional Services Fee <br /> The basic compensation mutually agreed upon by the ENGINEER and the <br /> COUNTY is as follows : <br /> Task Labor Fee <br /> Lump Sum Components <br /> Design Topographic Survey $23 ,700. 00 <br /> 66th Avenue Additional Survey Services $ 165062 . 50 <br /> Right-of-Way Survey and Mapping $26,250 .00 <br /> 66th Avenue/ Schumann Drive Route Study $37,020.00 <br /> Roadway Plans $ 82 ,480. 00 <br /> Signing & Marking Plans $ 95170.00 <br /> Stormwater Design/ Environmental Assessment $ 199630 . 00 <br /> Permitting $ 11 ,670.00 <br /> Stormwater Pollution Prevention Plan $4,240. 00 <br /> Signalization Plans $ 8,770 .00 <br /> Structural Headwall Design $6,500.00 <br /> Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.