Laserfiche WebLink
BID FORM for BID 2008027 <br />South RO Water Treatment Plant Improvements <br />Indian River County Utilities <br />.-Unit Price Total <br />Modify RO Treatment Trains <br />'Modi Chemical Systems <br />Quantit <br />Total <br />Unit <br />Replace , <br />Electrical <br />PumpsInstall <br />Modification Train <br />.. <br />1 <br />Scale Inhibitor Bulk Tanks-© <br />'' S stein Improvemetits1 Operational It--g- <br />�ir�Al[�1�,t►�L�1�J <br />r• <br />r• <br />'Bidding <br />Price <br />1. Supply and install new vessel sample tubing <br />• <br />LE <br />• ��9J! P �. rv.hi <br />�,iy; Yt ` nl%{ix.�iSf <br />{ � �xY yl 'k `j <br />1... :w`i1NR3�i ):rll^ <br />i <br />II <br />96 <br />Train Repair Schedule <br />Quantit <br />Total <br />Unit <br />Total <br />Modification Train <br /># <br />1 <br />2 <br />3 <br />4 <br />Quantity <br />Price <br />Price <br />1. Supply and install new vessel sample tubing <br />48 <br />48 <br />0 <br />0 <br />96 <br />from vessels to sample panel. <br />�3$. �w <br />8 <br />2. Supply and install new vessel sample tube <br />48 <br />48 <br />48 <br />48 <br />192 <br />3. <br />fittings from vessels. <br />Ir g•5 <br />•1 &3:2 <br />3. Supply and install new vessel permeate <br />48 <br />48 <br />20 <br />20 <br />136 <br />hoses, sample taps & associated fittings from <br />vessel to permeate headers. <br />153,C4 <br />5D 6o8 <br />4. Supply and install new 6" permeate headers <br />4 <br />4 <br />0 <br />0 <br />8 <br />r with saddle adapters, permeate port hose <br />adapters and 1/2" air relief valves at top of each <br />i <br />header plumbed to floor or drain area. <br />LRO <br />5. Repair leaking 6" permeate header ports and4 <br />4 <br />2 <br />2 <br />12 <br />install new permeate port hose adapters. <br />ao <br />I o <br />6. Supply and install new Galvanized Style 77 <br />40 <br />136 <br />192 <br />144 <br />512 <br />victaulic couplings with 316 SS hardware on <br />the feed, interstage, and concentrate stainless <br />steel headers and J -bend junction. <br />J 3b <br />7. Supply and install up to a total of twelve (12) <br />12 <br />6M pressure vessels, removal of old vessels, <br />associated parts with membrane swap out <br />Ar <br />including pigging and serial number data. <br />3 <br />8. Replace broken permeate port end adapters <br />10 <br />10 <br />10 <br />10 <br />40 <br />02 <br />ports using owners stocked parts as required. <br />gr <br />Total <br />044572017 <br />00300-5 <br />