Laserfiche WebLink
Amend Drawing Sheet W as follows: <br />EXISTING ZINC ORTHO INJECTION POINT <br />Add note No. 2—Once the existing zinc ortho injection point is relocated <br />to the clearwell, grind the injection port smooth and install a 24 -inch <br />stainless steel repair band, as manufactured by JCM industries or equal, on <br />the existing 24 -inch DIP spool. <br />Amend Drawing Sheet E4 as follows: <br />Keyed Electrical Notes No. 4—Provide 2 # 16 TSP, 1 "C and 24 # 14,1"C <br />from each new drive location to the existing PLC cabinet. Provide DI, <br />DO, Al, AO cards and associated terminal blocks as required if sufficient <br />I/O points in existing PLC panel do not exist. <br />CADocuments and Settingslmikehloca1 Set ingffemp\ADDENDUM NO. Ldoc <br />.5. <br />