Add the following new paragraphs immediately after existing paragraph 4 . 02 . 13 of the General Conditions : <br /> C . In preparation of the Contract Drawings , ENGINEER relied upon existing as-built/record drawings for <br /> physical conditions and information regarding or relating to existing surface and subsurface structures, existing <br /> above ground and underground utilities, and type and location of existing process equipment. These drawings <br /> are available for inspection at the County ' s Department of Utilities Services office located at 1800 27th Street, <br /> Vero Beach . <br /> Sc 4 . 03A Delete 4 . 03 A of the General Conditions in its entirety and replace it with the following : <br /> A . Notice. The Contractor shall promptly , and before such conditions are disturbed , and in no event later than <br /> 10 days after first observance of the conditions . Notify the Owner and Engineer in writing of. ( 1 ) subsurface or <br /> latent physical conditions at the site differing materially from those indicated in this Contract, or (2 ) unknown <br /> physical conditions at the site of an unusual nature, differing materially from those ordinarily encountered and <br /> generally recognized as inherent in Work of the character provided for in this Contract. The Owner will <br /> promptly investigate the conditions , and if it finds that such conditions do materially so differ and cause an <br /> increase or decrease in the Contractor' s cost of, or the time required for, performance of any part of the Work <br /> under this Contract, a Change Order shall be issued accordingly based on the Schedule of Values and executed <br /> by the Owner and the Contractor. Contractor' s failure to provide notice upon discovery of the differing site <br /> condition shall waive any entitlement to such an adjustment in the Contract Price or Contract Time . Further, no <br /> Claim of the Contractor under this paragraph 4 . 03A shall be allowed unless the Contractor has given the notice <br /> as required in this paragraph 4 . 03A . <br /> SC 4 . 03B . Delete paragraph 4 . 03B of the General Conditions in its entirety . <br /> SC 4 . 03C . 1 . Delete subparagraphs 4 . 03C1a. and b . of the General Conditions in its entirety . <br /> SC -4 . 03C3 . Delete paragraph 4 . 03C3 . of the General Conditions in its entirety . <br /> Add the following new paragraph immediately after paragraph 4 . 05A . of the General Conditions to read as <br /> follows : <br /> B . RESIDENT PROJECT REPRESENTATIVE may check the lines , elevations , reference marks , batter <br /> boards, etc . , set by Contractor, and Contractor shall correct any errors disclosed by such check. Such a check <br /> shall not be considered as approval of Contractor' s work and shall not relieve Contractor of the responsibility <br /> for accurate construction of the entire Work. Contractor shall furnish personnel to assist RESIDENT <br /> PROJECT REPRESENTATIVE in checking lines and grades . <br /> SC 4 . 06D Delete the last sentence of paragraph 4 . 06D of the General Conditions in its entirety <br /> SC 4 . 06G Delete paragraph 4 . 06G of the General Conditions in its entirety . <br /> ARTICLE 5 - BONDS AND INSURANCE <br /> SC 5 . 0IA Contractor shall furnish Performance and Payment Bonds, each in an amount at least equal to <br /> the Contract Price as security for the faithful performance and payment of all Contractor' s obligations <br /> under the Contract Documents . These Bonds shall remain in effect at least until one year after the date <br /> when final payment is paid becomes due, except as provided otherwise by Laws or Regulations or by the <br /> Contract Documents . Contractor shall also furnish such other Bonds as are required by the Contract <br /> Documents . Pursuant to Florida Statutes section 255 . 05 ( 1 ) (a) (2007 ) , any claimant (as such term is defined <br /> 044572017 <br /> 00800-5 <br />