My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:13:27 AM
Creation date
10/1/2015 12:33:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276A
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Improvements Conditions of Contract
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7555
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Add the following new paragraphs immediately after existing paragraph 4 . 02 . 13 of the General Conditions : <br /> C . In preparation of the Contract Drawings , ENGINEER relied upon existing as-built/record drawings for <br /> physical conditions and information regarding or relating to existing surface and subsurface structures, existing <br /> above ground and underground utilities, and type and location of existing process equipment. These drawings <br /> are available for inspection at the County ' s Department of Utilities Services office located at 1800 27th Street, <br /> Vero Beach . <br /> Sc 4 . 03A Delete 4 . 03 A of the General Conditions in its entirety and replace it with the following : <br /> A . Notice. The Contractor shall promptly , and before such conditions are disturbed , and in no event later than <br /> 10 days after first observance of the conditions . Notify the Owner and Engineer in writing of. ( 1 ) subsurface or <br /> latent physical conditions at the site differing materially from those indicated in this Contract, or (2 ) unknown <br /> physical conditions at the site of an unusual nature, differing materially from those ordinarily encountered and <br /> generally recognized as inherent in Work of the character provided for in this Contract. The Owner will <br /> promptly investigate the conditions , and if it finds that such conditions do materially so differ and cause an <br /> increase or decrease in the Contractor' s cost of, or the time required for, performance of any part of the Work <br /> under this Contract, a Change Order shall be issued accordingly based on the Schedule of Values and executed <br /> by the Owner and the Contractor. Contractor' s failure to provide notice upon discovery of the differing site <br /> condition shall waive any entitlement to such an adjustment in the Contract Price or Contract Time . Further, no <br /> Claim of the Contractor under this paragraph 4 . 03A shall be allowed unless the Contractor has given the notice <br /> as required in this paragraph 4 . 03A . <br /> SC 4 . 03B . Delete paragraph 4 . 03B of the General Conditions in its entirety . <br /> SC 4 . 03C . 1 . Delete subparagraphs 4 . 03C1a. and b . of the General Conditions in its entirety . <br /> SC -4 . 03C3 . Delete paragraph 4 . 03C3 . of the General Conditions in its entirety . <br /> Add the following new paragraph immediately after paragraph 4 . 05A . of the General Conditions to read as <br /> follows : <br /> B . RESIDENT PROJECT REPRESENTATIVE may check the lines , elevations , reference marks , batter <br /> boards, etc . , set by Contractor, and Contractor shall correct any errors disclosed by such check. Such a check <br /> shall not be considered as approval of Contractor' s work and shall not relieve Contractor of the responsibility <br /> for accurate construction of the entire Work. Contractor shall furnish personnel to assist RESIDENT <br /> PROJECT REPRESENTATIVE in checking lines and grades . <br /> SC 4 . 06D Delete the last sentence of paragraph 4 . 06D of the General Conditions in its entirety <br /> SC 4 . 06G Delete paragraph 4 . 06G of the General Conditions in its entirety . <br /> ARTICLE 5 - BONDS AND INSURANCE <br /> SC 5 . 0IA Contractor shall furnish Performance and Payment Bonds, each in an amount at least equal to <br /> the Contract Price as security for the faithful performance and payment of all Contractor' s obligations <br /> under the Contract Documents . These Bonds shall remain in effect at least until one year after the date <br /> when final payment is paid becomes due, except as provided otherwise by Laws or Regulations or by the <br /> Contract Documents . Contractor shall also furnish such other Bonds as are required by the Contract <br /> Documents . Pursuant to Florida Statutes section 255 . 05 ( 1 ) (a) (2007 ) , any claimant (as such term is defined <br /> 044572017 <br /> 00800-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.