SECTION 01170 <br /> SPECIAL PROVISIONS <br /> PART i — GENERAL <br /> 1 .01 INSTALLATION OF EQUIPMENT <br /> A . Special care shall be taken to ensure proper alignment of all equipment with particular <br /> reference to the pumps and electric drives. The units shall be carefully aligned on their <br /> foundations by qualified millwrights after their sole plates have been shimmed to true <br /> alignment at the anchor bolts. The anchor bolts shall be set in place and the nuts tightened <br /> against the shims . After the foundation alignments have been completed, the bedplates or <br /> wing feet of the equipment shall be securely bolted in place . The alignment of equipment <br /> shall be further checked after securing to the foundations, and after conformation of all <br /> alignments, the sole plates shall be finally grouted in place. The Contractor shall be <br /> responsible for the exact alignment of equipment with associated piping and under no <br /> circumstances, will "pipe springing" be allowed. <br /> B . All wedges, shims, filling pieces, keys, pacldng, grout, or other materials necessary to <br /> properly align, level and secure apparatus in place shall be furnished by the Contractor. <br /> All parts intended to be plumb or level must be proven exactly so. Perform all grinding <br /> necessary to bring parts to proper bearing after erection. <br /> i <br /> 1 .02 SLEEVES AND OPENINGS <br /> A. Provide all openings, channels, chases, etc, in new construction and furnish and install <br /> anchor bolts and other items to be embedded in concrete, as required to complete the work <br /> under this Contract. Perform all cutting, coring and rough and finish patching required in <br /> existing construction for the work of all trades. <br /> B . Subcontractors shall furnish all sleeves, inserts, hangers, anchor bolts, etc, required for the <br /> execution of their work. It shall be their responsibility before the work of the Contractor is <br /> begun to furnish him with the above items and with templates, drawings or written <br /> information covering chases, openings, etc, which they require and to follow up the work <br /> of the Contractor as it progresses, malting sure that their drawings and written instructions <br /> are carried out. Failing to do this, they shall be responsible for the cost of any corrective <br /> i measures which may be required to provide necessary openings, etc. If the Contractor fails <br /> i to carry out the directions given him, covering details and locations of openings, etc, he <br /> shall be responsible for any cutting and refinishing required to make the necessary <br /> corrections. In no case shall beams, lintels, or other structural members be cut without the <br /> approval of the Engineer. <br /> 1 .03 RELOCATION <br /> A. The Contractor shall be responsible for the relocation of structures, including but not <br /> limited to light poles, signs, sign poles, fences, piping, conduits and drains that interfere <br /> with the positioning of the work as set out on the Drawings. The cost of all such <br /> 1 <br /> ( 044572017 <br /> 01170- 1 <br />