My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:20:30 AM
Creation date
10/1/2015 12:34:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276B
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Supplementary Conditions
Area
South County RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
relocations shall be included in the bid for the project and shall not result in any additional <br /> cost to the Owner. <br /> 1 .04 GREASE, OIL AND FUEL <br /> A . All grease, oil , and fuel required for testing of equipment shall be furnished with the <br /> respective equipment. The Owner shall be fumished with a year ' s supply of all required <br /> lubricants including grease and oil of type recommended by the manufacturer with each <br /> item of equipment supplied under Divisions 11 , 14 , 15 , 16 , and 17 . <br /> 1 .05 TOOLS <br /> A . Any special tools (including grease guns or other lubricating devices) which may be <br /> necessary for the adjustment, operation and maintenance of any equipment shall be <br /> furnished with the respective equipment. <br /> B . Tools shall be famished in heavy steel tool boxes complete with lock and duplicate keys . <br /> 1 .06 POWER SUPPLY <br /> A. Unless otherwise specified, all motors Yz Hp and larger shall be designed for a power <br /> supply of 460 Volts, 3 Phase, 60 Hz, and all motors Y3 Hp and smaller shall be designed <br /> for a power supply of 120 Volts, single phase, 60 Hz. <br /> 1 .07 POWER FACTOR CORRECTION CAPACITORS <br /> A. All single and multi speed three phase induction motors 5 Hp and larger shall be furnished <br /> with factory provided power factor correction capacitors. <br /> Be Capacitors shall be sized by the manufacturers such that over voltage due to self excitation <br /> will be prevented and transient torques limited to normal values. Full load power factor <br /> shall be corrected to not less than 0 .95 where such correction will not violate the <br /> provisions of NEC Article 460 . <br /> C. Capacitor enclosures shall be compatible with those specified for their respective motors. <br /> D. Capacitors shall be dry or oil insulated with integral fuse protection and discharge resistor. <br /> The insulating medium- shall be non-flammable and meet U.S . Environmental Protection <br /> Agency Standards, <br /> E. Capacitors shall be installed under Division 16 , <br /> 1 .08 ARCHITECTURAL COATINGS <br /> A. Maintain coordination among all Sections (windows, window walls, louvers, doors and i <br /> frames, etc.) requiring PGVF, PVC or anodic coatings. All coatings shall match to the <br /> satisfaction of the Engineer with regard to color and texture. Items rejected by the I <br /> Engineer shall promptly be removed from the job site. <br /> c <br /> 044572017 <br /> 01170-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.