B . Accidents shall be reported immediately to the Engineer by messenger or phone. <br /> C. All accidents shall be documented by the Contractor and a fully detailed written report <br /> submitted by the Contractor to the Engineer after each accident. <br /> 1 . 22 TRAFFIC CONTROL <br /> A . The Contractor shall ensure that vehicular flow is maintained in a safe manner and shall <br /> adhere to all State and Local requirements for maintenance of traffic , safety precautions , and <br /> lighting . Should the Owner request the preparation and submittal of a traffic maintenance <br /> and/or safety plan , the Contractor will do so , at no additional cost to the Owner, within 21 <br /> days of receipt of request . <br /> 1 .23 WORK ADJACENT TO UTILITY FACILITIES <br /> A. The attention of the Contractor is drawn to existing overhead and underground utility facilities <br /> in the area of the Work. The Contractor shall protect all existing utility transmission and <br /> distribution facilities throughout the period of construction and shall notify the offices all <br /> utility companies at least 72 hours prior to the start of any construction . <br /> B . It is the full and complete responsibility of the Contractor to determine the exact location of all <br /> overhead and underground utility transmission and distribution facilities in the area of the <br /> Work whether or not they are indicated on the Drawings . <br /> 1 .24 SALVAGE <br /> A. Any existing equipment or material, including but not limited to, valves, pipes, fittings, <br /> couplings, etc. , which is removed or replaced as a result of construction under this project <br /> may be designated as salvage by the Engineer or Owner and if so shall be excavated, if <br /> necessary, and shall be cleaned and stored on or adjacent to the site in a protected place <br /> specified by the Owner or loaded into trucks provided by the Owner. Any equipment or <br /> material not worthy of salvaging, as directed by the Owner, shall be disposed of by the <br /> Contractor at a suitable location at the Contractor's expense . <br /> 1 .25 POTABLE WATER FOR TESTING AND CONSTRUCTION <br /> A. The Contractor shall be responsible for obtaining a temporary water meter from the Owner <br /> for the metering of the potable water used during :testing and construction. The Owner <br /> shall provide this water at no cost to the Contractor, as long as the water is used at the <br /> project site exclusively. The Owner will perform daily tracking of water usage volumes. <br /> 1 .26 DISINFECTION <br /> A. The Contractor shall clean, disinfect, and bacteriologically test and clear in accordance <br /> with Chapters 17-550, 17-555 , and 17-560 of the Florida Administrative Code (FAC) and <br /> the local Health Department requirements, all water supply facilities affected by this <br /> project which shall come into contact with raw water, water being treated or treated water <br /> prior to placing the facility in operation. The above statement shall apply to both new <br /> facilities installed, and existing facilities which are to be impacted. <br /> I� <br /> t <br /> 044572017 <br /> 01170-6 <br />