Laserfiche WebLink
1 . 17 CONNECTIONS TO EXISTING SYSTEMS <br /> A . The Contractor shall perform all work necessary to locate, excavate and prepare for <br /> connections to the existing reverse osmosis water treatment plant as shown on the <br /> Drawings or where directed by the Owner . The cost for this work and for the actual <br /> connection to the existing reverse osmosis water treatment plant shall be included in the <br /> bid for the project and shall not result in any additional cost to the Owner . <br /> B . It is the responsibility of the Contractor to expose as required, the existing pipes at the <br /> tie-in locations and , if necessary, any buried utilities in the immediate area of the tie-in <br /> that may affect the installation of new pipe as shown on the Drawings . Contractor is fully <br /> responsible for ordering any additional material, such as fittings and restrained pipe that <br /> may be needed to avoid existing buried utilities should such material not be shown on the <br /> Drawings or included in the Schedule of Prices. The Contractor may not schedule any <br /> tie-in activity until such additional material is on site and a specific detailed plan is <br /> approved by the Engineer in accordance with Section 01014 . <br /> 1 . 18 OBSTRUCTIONS <br /> i <br /> A. The attention of the Contractor is drawn to the fact that during excavation at the Project <br /> site, the possibility exists of the Contractor encountering various water, chemical , <br /> J electrical, or other lines not shown on the Drawings. The Contractor shall exercise <br /> extreme care before and during excavation to locate and flag these lines so as to avoid <br /> damage to the existing lines . Should damage occur to an existing line, the Contractor shall <br /> repair the line at no cost to the Owner. <br /> B . It is the responsibility of the Contractor to ensure that all utility or other poles, the stability <br /> of which may be endangered by the close proximity of excavation, are temporarily stayed <br /> in position while work proceeds in the vicinity of the pole and that the utility or other <br /> 1 companies concerned be given reasonable advance notice of any such excavation by the <br /> Contractor. <br /> ' 1 . 19 PROVISIONS FOR THE CONTROL OF DUST AND LITTER <br /> IA. Sufficient precautions shall be taken during construction to minimize the amount of dust <br /> created. Wetting down the site may be required or as directed by the Owner to prevent <br /> dust as a result of vehicular traffic. Control of blowing litter caused by any regrading by <br /> jthe Contractor shall be the responsibility of the Contractor. <br /> 4 1 .20 ON SITE STORAGE <br /> l A. The Contractor's attention is invited to special storage requirements and possible charges <br /> for noncompliance of on-site storage requirements for materials and equipment as <br /> specified in Section 01610 . <br /> 1 .21 EMERGENCY PHONE NUMBERS AND ACCIDENT REPORTS <br /> A. Emergency phone numbers (fire, medical, police, and Contractor' s emergency after hours <br /> number) shall be posted at the Contractor's phone and its locations be made to known to <br /> all . <br /> 1 044572017 <br /> 01170-5 <br />