My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:20:30 AM
Creation date
10/1/2015 12:34:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276B
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Supplementary Conditions
Area
South County RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 13 HURRICANE PREPAREDNESS PLAN <br /> A. Within 30 days of the date of Notice to Proceed, submit a Hurricane Preparedness Plan to <br /> the Engineer and the Owner for approval . The Plan shall describe in detail the necessary <br /> measures which the Contractor will perform, at no additional costs to the Owner, in case <br /> of a hurricane warning . Revise Plan as required by the Engineer and Owner. <br /> 1 . 14 WEATHER PROTECTION <br /> A . In the event of inclement weather , the Contractor shall protect the Work and materials <br /> from damage or injury from the weather . If, in the opinion of the Owner, any portion of <br /> the Work or materials has been damaged by reason of failure on the part of the Contractor <br /> to so protect the Work, such Work and materials shall be removed and replaced with new <br /> materials and Work to the satisfaction of the Owner. <br /> 1 . 15 PROVISIONS FOR CONTROL OF EROSION <br /> A. Sufficient precautions shall be taken during construction to minimize the run-off of <br /> polluting substances such as silt, clay, fuels, oils, bitumens, calcium chloride, or other <br /> polluting materials harmful to humans, fish, or other life, into the supplies and surface <br /> waters of the State. Control measures must be adequate to assure that turbidity in the <br /> receiving water will not be increased more than 10 nephelometric turbidity units (NTU), <br /> or as otherwise required by the State or other controlling body, in water used for public <br /> water supply or fish unless limits have been established for the particular water. In surface <br /> water used for other purposes, the turbidity must not exceed 25 NTU unless otherwise <br /> permitted. Special precautions shall be taken in the use of construction equipment to <br /> prevent operations which promote erosion. <br /> 1 . 16 WARRANTIES <br /> A. Unless specified otherwise in the Contract Documents, all equipment supplied under these <br /> Specifications shall be warranted by the Contractor and the equipment Manufacturers for a <br /> minimum period of one ( 1 ) year . Warranty period shall commence on the date of Owner <br /> acceptance. <br /> B . The equipment shall be warranted to be free from defects in workmanship, design, and <br /> materials. If any part of the equipment should fail during the warranty period, it shall be <br /> replaced in the machine(s) and the unit(s) restored to service at no expense to the Owner. <br /> Co The Manufacturer's warranty period shall run concurrently with the Contractor's warranty <br /> or guarantee period. No exception to this provision shall be allowed. The Contractor shall <br /> be responsible for obtaining equipment warranties in accordance with Section 01740 from <br /> each of the respective suppliers or Manufacturers for all the equipment specified under <br /> Divisions 11 , 14 , 15 , 16, and 17 . <br /> D. In the event that the Manufacturer is unwilling to provide a one year warranty <br /> commencing at the time of Owner acceptance, the Contractor shall obtain from the <br /> Manufacturer a two (2) year warranty starting at the time of equipment delivery to the job <br /> site. This two-year warranty shall not relieve the Contractor of the one-year warranty <br /> starting at the time of Owner acceptance of the equipment. <br /> 044572017 <br /> 01170-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.