W& N a 6 ' . I . <br />1. Review, approval of minutes of previous meeting. <br />2. Review of work progress since previous meeting. <br />3. Field observations, problems and conflicts. <br />4. Problems which impede Construction Schedule. <br />5. Review of off-site fabrication, delivery schedules. <br />6. Corrective measures and procedures to regain projected schedule. <br />7. Revisions to Construction Schedule. <br />8. Progress, schedule, during succeeding work period. <br />9. Coordination of schedules. <br />10. Review submittal schedules; expedite as required. <br />11. Maintenance of quality standards. <br />12. Pending changes and substitutions. <br />13. Review proposed changes for: <br />a. Effect on Construction Schedule and on completion date. <br />b. Effect on other contracts of the project. <br />14. Other business. <br />15. Construction schedule. <br />16. Critical/long lead items. <br />F. Attend progress meetings and is to study previous meeting minutes and current agenda <br />items, in order to be prepared to discuss pertinent topics such as deliveries of materials and <br />equipment, progress of the work, etc. <br />G. Provide a current submittal log at each progress meeting in accordance with Section <br />01300, <br />PART 2 — PRODUCTS (NOT USED) <br />PART 3 — EXECUTION (NOT USED) <br />END OF SECTION <br />044572017 <br />01200-3 <br />