C. Yard Piping Installation <br />d. Each Major Structure or System and Associated Piping and Equipment <br />e. Each Chemical Feed System <br />f. Electrical Systems Installation and Programrning <br />g. System Startup and Testing <br />h. Site Restoration and Cleanup <br />3. Show projected percentage of completion for each item, as of the first day of <br />each month. <br />4. Show projected dollar cash flow requirements for each month of construction. <br />1.05 PROGRESS REVISIONS <br />A. Indicate progress of each activity to date of submission <br />Be Show changes occurring since previous submission of Schedule: <br />1. Major changes in scope. <br />2. Activities modified since previous submission. <br />3. Revised projections of progress and completion. <br />4. Other identifiable changes. <br />C. Provide a narrative report as needed to define: <br />1. Problem areas, anticipated delays, and the impact on the schedule. <br />2. Corrective action recommended, and its effect. <br />3. The effect of changes on schedules of other prime Contractors. <br />1.06 SUBMISSIONS <br />A. Submit initial schedules within ten (10) days after award of Contract; Owner and <br />Engineer will review schedules for information only. Submit to Owner and Engineer, <br />one (1) reproducible transparency, five (5) blueline prints and one (1) computer CD of <br />the initial schedule. <br />Be Submit to the Owner and Engineer, one (1) reproducible transparency, five (5) blueline <br />prints and one (1) computer CD of the revised schedule within 14 calendar days of <br />approval of the initial schedule. <br />C. Submit revised progress schedules with each application for payment or monthly, <br />whichever is the shortest period. Submit one (1) blueline print of the previous schedule <br />with annotations showing status and changes, one (1) reproducible transparency, and one <br />(1) computer CD of the updated schedule. Along with the updated schedules, submit: <br />1. A narrative report. <br />2. An updated summarized milestone schedule to reflect current project status. <br />Identify any changes invoked or contemplated to the original program plan. <br />1.07 DISTRIBUTION <br />A. Distribute copies of approved schedules to: <br />1. Owner <br />2, Engineer <br />3. Job site file <br />4. Subcontractors <br />5. Other concerned parties <br />044572017 <br />01311-2 <br />