My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:20:30 AM
Creation date
10/1/2015 12:34:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276B
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Supplementary Conditions
Area
South County RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 .03 COORDINATING SCHEDULES WITH OTHER CONTRACT SCHEDULES <br /> A. Where work is to be performed under this contract concurrently with and/or contingent <br /> upon work performed on the same facilities or area under other contracts , the <br /> Contractor ' s schedule shall be coordinated with the schedules of the other contracts . The <br /> Contractor shall obtain the schedules of the other appropriate contracts from the Engineer <br /> and/or Owner for the preparation and updating of his schedule and shall make the <br /> required changes in his schedule when indicated by changes in corresponding schedules . <br /> END OF SECTION <br /> (Remainder of This Page Intentionally Left Blank) <br /> i <br /> I <br /> i <br /> i <br /> 1 <br /> �I <br /> I <br /> t <br /> 1 <br /> I <br /> 1 <br /> I <br /> I 044572017 <br /> 01311 -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.