Laserfiche WebLink
SECTION 01340 <br /> SUBMITTALS <br /> PART 1 - GENERAL <br /> 1 .01 DESCRIPTION OF REQUIREMENTS <br /> A. This Section specifies the general methods and requirements of submissions applicable to <br /> Shop Drawings, Product Data, Samples, Construction Photographs, and Construction or <br /> Submittal Schedules . Additional general submission requirements are contained in Article <br /> 6 . 17 of the General Conditions . Detailed submittal requirements are specified in the <br /> technical Sections . <br /> j B . All submittals shall be clearly identified by reference to Section Number, Paragraph, <br /> Drawing Number or Detail as applicable. Submittals shall be clear and legible and of <br /> sufficient size for presentation of data. <br /> I C . The Contractor is to maintain an accurate updated submittal log and will bring this log to <br /> each scheduled progress meeting with the Owner' s representatives . This log should <br /> include the following items : <br /> t1 . Submittal-Description and File number assigned. <br /> 2 . Date to Engineer. <br /> 3 . Date returned to Contractor from Engineer. <br /> 4. Status of submittal (REVIEWED, NO COMMENTS ; REVIEWED COMMENTS <br /> AS NOTED ; REJECTED, REVISE AND RESUBMIT; or NOT REVIEWED) . <br /> 5 . Date of resubmittal and return (as applicable) . <br /> 6 . Date material released for fabrication. <br /> 7 . Projected date of fabrication. <br /> I 8 . Projected date of delivery to site. <br /> 9 . Status of O&M submittal . <br /> 1 1 .02 SHOP DRAWINGS , PRODUCT DATA, SAMPLES <br /> A. Shop Drawings <br /> 1 . Shop drawings as specified in individual Sections include, custom-prepared data <br /> such as fabrication and erection/installation (working) drawings, scheduled <br /> information, setting diagrams, actual shop work manufacturing instructions, <br /> custom templates, special wiring diagrams, coordination drawings, individual <br /> system or equipment inspection and test reports including performance curves and <br /> certifications, as applicable to the work <br /> 2. All shop drawings submitted by subcontractors shall be sent directly to the <br /> I Contractor for checking. The Contractor shall be responsible for their submission <br /> at the proper time so as to prevent delays in delivery of materials. <br /> 3 . Check all subcontractors' shop drawings regarding measurements, size of <br /> members, materials and details to make sure that they conform to the intent of the <br /> Drawings and related Sections. Return shop drawings found to be inaccurate or <br /> otherwise in error to the subcontractors for correction before submission thereof. <br /> 044572017 <br /> ` 01340- 1 <br />