My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:20:30 AM
Creation date
10/1/2015 12:34:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276B
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Supplementary Conditions
Area
South County RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01340 <br /> SUBMITTALS <br /> PART 1 - GENERAL <br /> 1 .01 DESCRIPTION OF REQUIREMENTS <br /> A. This Section specifies the general methods and requirements of submissions applicable to <br /> Shop Drawings, Product Data, Samples, Construction Photographs, and Construction or <br /> Submittal Schedules . Additional general submission requirements are contained in Article <br /> 6 . 17 of the General Conditions . Detailed submittal requirements are specified in the <br /> technical Sections . <br /> j B . All submittals shall be clearly identified by reference to Section Number, Paragraph, <br /> Drawing Number or Detail as applicable. Submittals shall be clear and legible and of <br /> sufficient size for presentation of data. <br /> I C . The Contractor is to maintain an accurate updated submittal log and will bring this log to <br /> each scheduled progress meeting with the Owner' s representatives . This log should <br /> include the following items : <br /> t1 . Submittal-Description and File number assigned. <br /> 2 . Date to Engineer. <br /> 3 . Date returned to Contractor from Engineer. <br /> 4. Status of submittal (REVIEWED, NO COMMENTS ; REVIEWED COMMENTS <br /> AS NOTED ; REJECTED, REVISE AND RESUBMIT; or NOT REVIEWED) . <br /> 5 . Date of resubmittal and return (as applicable) . <br /> 6 . Date material released for fabrication. <br /> 7 . Projected date of fabrication. <br /> I 8 . Projected date of delivery to site. <br /> 9 . Status of O&M submittal . <br /> 1 1 .02 SHOP DRAWINGS , PRODUCT DATA, SAMPLES <br /> A. Shop Drawings <br /> 1 . Shop drawings as specified in individual Sections include, custom-prepared data <br /> such as fabrication and erection/installation (working) drawings, scheduled <br /> information, setting diagrams, actual shop work manufacturing instructions, <br /> custom templates, special wiring diagrams, coordination drawings, individual <br /> system or equipment inspection and test reports including performance curves and <br /> certifications, as applicable to the work <br /> 2. All shop drawings submitted by subcontractors shall be sent directly to the <br /> I Contractor for checking. The Contractor shall be responsible for their submission <br /> at the proper time so as to prevent delays in delivery of materials. <br /> 3 . Check all subcontractors' shop drawings regarding measurements, size of <br /> members, materials and details to make sure that they conform to the intent of the <br /> Drawings and related Sections. Return shop drawings found to be inaccurate or <br /> otherwise in error to the subcontractors for correction before submission thereof. <br /> 044572017 <br /> ` 01340- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.