Laserfiche WebLink
4. All details on shop drawings shall show clearly the relation of the various parts to <br /> the main members and lines of the structure and where correct fabrication of the <br /> work depends upon field measurements, such measurements shall be made and <br /> noted on the drawings before being submitted _ <br /> 5 . Submittals for equipment specified under Divisions I 1 and 14 shall include a <br /> listing of all installations where identical or similar equipment has been installed <br /> and been in operation for a period of at least one year. <br /> B . Product Data <br /> 1 . Product data as specified in individual Sections include, standard prepared data <br /> for manufactured products (sometimes referred to as catalog data), such as the <br /> manufacturer's product specification and installation instructions, availability of <br /> colors and patterns , manufacturer's printed statements of compliances and <br /> applicability, roughing-in diagrams and templates, catalog cuts, product <br /> photographs, standard wiring diagrams, printed performance curves and <br /> operational-range diagrams, production or quality control inspection and test <br /> reports and certifications, mill reports, product operating and maintenance <br /> instructions and recommended spare-parts listing and printed product warranties, <br /> as applicable to the work. <br /> C. Samples <br /> 1 . Samples specified in individual Sections include, physical examples of the work <br /> such as sections of manufactured or fabricated work, small cuts or containers of <br /> materials, complete units of repetitively-used products, color/texture/pattern <br /> swatches and range sets, specimens for coordination of visual effect, graphic <br /> symbols and units of work to be used by the Engineer or Owner for independent <br /> inspection and testing, as applicable to the work <br /> 2 . The Contractor shall prepare a transmittal letter in triplicate for each shipment of <br /> samples. Contractor shall enclose a copy of this letter with the shipment and send <br /> a copy of this letter to the Engineer. Approval of a sample shall be only for the <br /> characteristics or use named in such approval and shall not be construed to change <br /> or modify any Contract Requirements. <br /> 1 .03 CONTRACTOR'S RESPONSIBILITIES <br /> A. Review shop drawings, product data and samples, including those by subcontractors, prior <br /> to submission to determine and verify the following: <br /> 1 . Field measurements <br /> 2. Field construction criteria <br /> 3 . Catalog numbers and similar data <br /> 4. Conformance with related Sections <br /> Be Each shop drawing, sample and product data submitted by the Contractor shall have <br /> affixed to it the following Certification Statement including the Contractor's Company <br /> name and signed by the Contractor: "Certification Statement: by this submittal, I hereby <br /> represent that I have determined and verified all field measurements, field construction <br /> criteria, materials, dimensions, catalog numbers and similar data and I have checked and <br /> coordinated each item with other applicable approved shop drawings and all Contract <br /> requirements. " Shop drawings and product data sheets 11 -inch by 17-inch and smaller <br /> shall be bound together in an orderly fashion and bear the above Certification Statement <br /> 044572017 <br /> 01340-2 <br /> I <br />