Laserfiche WebLink
on the cover sheet. The cover sheet shall fully describe the packaged data and include a <br /> listing of all items within the package. Provide to the Resident Project Representative a <br /> copy of each transmittal sheet for shop drawings, product data and samples at the time of <br /> submittal to the Engineer. <br /> C . The Contractor shall utilize the following Shop Drawing numbering system : <br /> 1 . The Submittal Log Number shall reference the Specification Section Number_ <br /> 2 . The numbering system shall be specification section number followed by a " 1 " for <br /> original submittal , " 1A " for first resubmittal and so forth , ( for example : 15050 - 1 , <br /> 15050 - 1A, 15050 - 1B . . . ) <br /> D . Notify the Engineer in writing, at the time of submittal , of any deviations in the submittals <br /> from the requirements of the Contract Documents. <br /> E. The review and approval of shop drawings, samples or product data by the Engineer shall <br /> not relieve the Contractor from the responsibility for the fulfillment of the terms of the <br /> Contract. All risks of error and omission are assumed by the Contractor and the Engineer <br /> will have no responsibility therefor. <br /> F.- No portion of the work requiring a shop drawing, sample, or product data shall be started <br /> nor shall any materials be fabricated or installed prior to the approval or qualified approval <br /> of such item. Fabrication performed, materials purchased or on-site construction <br /> l accomplished which does not conform to approved shop drawings and data shall be at the <br /> Contractor's risk. The Owner will not be liable for any expense or delay due to corrections <br /> or remedies required to accomplish conformity. <br /> J <br /> G. Project work, materials, fabrication, and installation shall conform with approved shop <br /> drawings, applicable samples, and product data. <br /> I <br /> 1 .04 SUBMISSION REQUIREMENTS <br /> ` A . Make submittals promptly in accordance with approved schedule and in such sequence as <br /> to cause no delay in the Work or in the work of any other contractor. <br /> B . Each submittal, appropriately coded, will be returned within 30 calendar days following <br /> receipt of submittal by the Engineer. <br /> 1 C . Number of submittals required: <br /> 1 . Shop Drawings: Submit the number of opaque reproductions which the contractor <br /> requires, plus five (5) copies which will be retained by the Engineer. <br /> I 2 . Product Data: Submit the number of copies which the Contractor requires, plus five <br /> l (5 ) copies which will be retained by the Engineer. <br /> I 3 , Samples: Submit the number stated in the respective Sections . <br /> ( D. Submittals shall contain: <br /> 1 . The date of submission and the dates of any previous submissions . <br /> 2 . The Project title and number. <br /> 3 . Contractor identification. <br /> 4 . The names of <br /> i a. Contractor <br /> 044572017 <br /> 01340-3 <br />