on the cover sheet. The cover sheet shall fully describe the packaged data and include a <br />listing of all items within the package. Provide to the Resident Project Representative a <br />copy of each transmittal sheet for shop drawings, product data and samples at the time of <br />submittal to the Engineer. <br />C. The Contractor shall utilize the following Shop Drawing numbering system: <br />1. The Submittal Log Number shall reference the Specification Section Number_ <br />2. The numbering system shall be specification section number followed by a "1" for <br />original submittal, "1A" for first resubmittal and so forth, (for example: 15050-1, <br />15050-1A, 15050-1B...) <br />D. Notify the Engineer in writing, at the time of submittal, of any deviations in the submittals <br />from the requirements of the Contract Documents. <br />E. The review and approval of shop drawings, samples or product data by the Engineer shall <br />not relieve the Contractor from the responsibility for the fulfillment of the terms of the <br />Contract. All risks of error and omission are assumed by the Contractor and the Engineer <br />will have no responsibility therefor. <br />F.- No portion of the work requiring a shop drawing, sample, or product data shall be started <br />nor shall any materials be fabricated or installed prior to the approval or qualified approval <br />of such item. Fabrication performed, materials purchased or on-site construction <br />accomplished which does not conform to approved shop drawings and data shall be at the <br />Contractor's risk. The Owner will not be liable for any expense or delay due to corrections <br />or remedies required to accomplish conformity. <br />G. Project work, materials, fabrication, and installation shall conform with approved shop <br />drawings, applicable samples, and product data. <br />1.04 SUBMISSION REQUIREMENTS <br />A. Make submittals promptly in accordance with approved schedule and in such sequence as <br />to cause no delay in the Work or in the work of any other contractor. <br />B. Each submittal, appropriately coded, will be returned within 30 calendar days following <br />receipt of submittal by the Engineer. <br />C. Number of submittals required: <br />1. Shop Drawings: Submit the number of opaque reproductions which the contractor <br />requires, plus five (5) copies which will be retained by the Engineer. <br />2. Product Data: Submit the number of copies which the Contractor requires, plus five <br />(5) copies which will be retained by the Engineer. <br />3, Samples: Submit the number stated in the respective Sections. <br />D. Submittals shall contain: <br />1. The date of submission and the dates of any previous submissions. <br />2. The Project title and number. <br />3. Contractor identification. <br />4. The names of <br />a. Contractor <br />044572017 <br />01340-3 <br />