My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:20:30 AM
Creation date
10/1/2015 12:34:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276B
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Supplementary Conditions
Area
South County RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on the cover sheet. The cover sheet shall fully describe the packaged data and include a <br /> listing of all items within the package. Provide to the Resident Project Representative a <br /> copy of each transmittal sheet for shop drawings, product data and samples at the time of <br /> submittal to the Engineer. <br /> C . The Contractor shall utilize the following Shop Drawing numbering system : <br /> 1 . The Submittal Log Number shall reference the Specification Section Number_ <br /> 2 . The numbering system shall be specification section number followed by a " 1 " for <br /> original submittal , " 1A " for first resubmittal and so forth , ( for example : 15050 - 1 , <br /> 15050 - 1A, 15050 - 1B . . . ) <br /> D . Notify the Engineer in writing, at the time of submittal , of any deviations in the submittals <br /> from the requirements of the Contract Documents. <br /> E. The review and approval of shop drawings, samples or product data by the Engineer shall <br /> not relieve the Contractor from the responsibility for the fulfillment of the terms of the <br /> Contract. All risks of error and omission are assumed by the Contractor and the Engineer <br /> will have no responsibility therefor. <br /> F.- No portion of the work requiring a shop drawing, sample, or product data shall be started <br /> nor shall any materials be fabricated or installed prior to the approval or qualified approval <br /> of such item. Fabrication performed, materials purchased or on-site construction <br /> l accomplished which does not conform to approved shop drawings and data shall be at the <br /> Contractor's risk. The Owner will not be liable for any expense or delay due to corrections <br /> or remedies required to accomplish conformity. <br /> J <br /> G. Project work, materials, fabrication, and installation shall conform with approved shop <br /> drawings, applicable samples, and product data. <br /> I <br /> 1 .04 SUBMISSION REQUIREMENTS <br /> ` A . Make submittals promptly in accordance with approved schedule and in such sequence as <br /> to cause no delay in the Work or in the work of any other contractor. <br /> B . Each submittal, appropriately coded, will be returned within 30 calendar days following <br /> receipt of submittal by the Engineer. <br /> 1 C . Number of submittals required: <br /> 1 . Shop Drawings: Submit the number of opaque reproductions which the contractor <br /> requires, plus five (5) copies which will be retained by the Engineer. <br /> I 2 . Product Data: Submit the number of copies which the Contractor requires, plus five <br /> l (5 ) copies which will be retained by the Engineer. <br /> I 3 , Samples: Submit the number stated in the respective Sections . <br /> ( D. Submittals shall contain: <br /> 1 . The date of submission and the dates of any previous submissions . <br /> 2 . The Project title and number. <br /> 3 . Contractor identification. <br /> 4 . The names of <br /> i a. Contractor <br /> 044572017 <br /> 01340-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.