Laserfiche WebLink
b . Supplier <br /> C . Manufacturer <br /> 5 . Identification of the product, with the section number, page and paragraph(s). <br /> 6 . Field dimensions, clearly identified as such. <br /> 7 . Relation to adjacent or critical features of the work or materials . <br /> 8 . Applicable standards , such as ASTM or Federal Standards numbers . <br /> 9 . Identification of deviations from Contract Documents . <br /> 10 . Identification of revisions on resubmittals . <br /> IL A blank space suitably sized for Contractor and Engineer stamps . <br /> 12 . Contractor ' s stamp or review and approval , initialed or signed , certifyirâ–ºg to review <br /> of initialed or signed, certifying to review of submittal , verification of products, field <br /> measurements and field construction criteria, and coordination of the information <br /> within the submittal with requirements of the work and of Contract Documents . <br /> 13 . Where calculations are required to be submitted by the Contractor, the <br /> calculations shall have been checked by a qualified individual other than the <br /> preparer. The submitted calculations shall clearly show the names of the preparer <br /> and of the checker. <br /> 1 .05 REVIEW OF SHOP DRAWINGS , PRODUCT DATA, WORKING DRAWINGS AND <br /> SAMPLES <br /> A. The review of shop drawings, data and samples will be for general conformance with the <br /> design concept and Contract Documents. They shall not be construed : <br /> 1 , as permitting any departure from the Contract requirements; <br /> 2 , as relieving the Contractor of responsibility for any errors, including details, <br /> dimensions, and materials; <br /> 3 , as approving departures from details furnished by the Engineer, except as <br /> otherwise provided herein. <br /> B . The Contractor remains responsible for details and accuracy, for coordinating the work <br /> with all other associated work and trades, for selecting fabrication processes, for <br /> techniques of assembly, and for performing work in a safe manner. <br /> C. If the shop drawings, data or samples as submitted describe variations and show a <br /> departure from the Contract requirements which Engineer finds to be in the interest of the <br /> Owner and to be so minor as not to involve a change in Contract Price or Contract Time, <br /> the Engineer may return the reviewed drawings without noting an exception. <br /> D . When reviewed by the Engineer each of the Shop Drawings will be identified as having <br /> received such review being so stamped and dated. Shop Drawings stamped <br /> "REVIEWED, COMMENTS AS NOTED" OR "REJECTED, REVISE AND <br /> RESUBMIT" and with required corrections shown will be returned to the Contractor for <br /> correction and resubmittal. <br /> E. Resubmittals will be handled in the same manner as first submittals. On resubmittals the <br /> Contractor shall identify all revisions made to the submittals, either in writing on the letter 4 <br /> of transmittal or on the shop drawings by use of revision triangles or othersimilar <br /> methods . The resubmittal shall clearly respond to each comment made by the Engineer on <br /> the previous submission. Additionally, the Contractor shall direct specific attention to any <br /> 044572017 <br /> 01340-4 <br /> I <br />