revisions made other than the corrections requested by the Engineer on previous <br />submissions. <br />F. Partial submittals may not be reviewed. The Engineer will be the only judge as to the <br />completeness of a submittal. Submittals not complete will be returned to the Contractor <br />and will be considered "Not Approved" until resubmitted. The Engineer may at his option <br />provide a list or mark the submittal directing the Contractor to the areas that are <br />incomplete. <br />G. Repetitive Review <br />1. Shop Drawings and other submittals will be reviewed no more than twice at the <br />Owner's expense. All subsequent reviews will be performed at times convenient <br />to the Engineer and at the Contractor's expense based on the Engineer's then <br />prevailing rates. The Contractor shall reimburse the Owner for all such fees <br />invoiced to the Owner by the Engineer. Submittals are required until approved, <br />2. Any need for more than one resubmission, or any other delay in obtaining <br />Engineer's review of submittal will not entitle Contractor to extension of the <br />contract time. <br />H. If the Contractor considers any correction indicated on the shop drawings to constitute a <br />change to the Contract Documents, the Contractor shall give written notice thereof to the <br />Engineer at least 7 working days prior to release for manufacture. <br />I. When the shop drawings have been completed to the satisfaction of the Engineer, the <br />Contractor shall carry out the construction in accordance therewith and shall make no <br />further changes therein except upon written instructions from the Engineer. <br />i I O T_W3Ii: iJ1�Ci]�i <br />A. Distribute reproductions of approved shop drawings and copies of approved product data <br />and samples, where required, to the job site file and elsewhere as directed by the Engineer. <br />Number of copies shall be as directed by the Engineer but shall not exceed six. <br />1.07 GENERAL PROCEDURES FOR SUBMITTALS <br />A. Coordination of Submittal Times: Prepare and transmit each submittal sufficiently in <br />advance of performing the related work or other applicable activities, or within the time <br />specified in the individual work of other related Sections, so that the installation will not <br />be delayed by processing times including disapproval and resubmittal (if required), <br />coordination with other submittals, testing, purchasing, fabrication, delivery and similar <br />sequenced activities. No extension of time will be authorized because of the Contractor's <br />failure to transmit submittals sufficiently in advance of the Work <br />END OF SECTION <br />044572017 <br />01340-5 <br />