My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:20:30 AM
Creation date
10/1/2015 12:34:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276B
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Supplementary Conditions
Area
South County RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
storing and protecting the area such that adjacent residents, canals, and wetlands are not <br /> impacted. The CONTRACTOR shall be solely responsible for implementing theft <br /> prevention measures. The OWNER shall bear no responsibility for materials stolen or acts <br /> of vandalism. The CONTRACTOR shall supply temporary enclosed, locked storage for <br /> OWNER ' s spare parts until Substantial Completion . <br /> 1 .08 CONNECTION TO WORK BY OTHERS OR EXISTING LINES <br /> A . Piping installed under this Contract must connect to lines installed under other contracts . <br /> The CONTRACTOR under this Contract shall perform the following work and include <br /> the cost thereof in the Contract price : <br /> 1 . Remove any temporary plugs and thrust restraints provided in the pipe installed <br /> under other contracts . <br /> 2 . Furnish and install necessary pipe, sleeves, fittings , specials and appurtenances to <br /> make proper connections to pipes installed by others . <br /> 3 . Pressure test connections prior to connecting new piping. <br /> 4 . Disinfect and bacteriologically test all new potable water piping. <br /> B . Connection to existing lines to which piping of this Contract must connect: <br /> 1 . Expose buried lines to confirm or determine horizontal and vertical location of all <br /> underground piping, pipe diameter, end connection, and pipe material . <br /> 2 . Furnish and install all material, labor, and equipment including appropriate pipe, <br /> fittings, specials, and appurtenances to make proper connections. <br /> 3 . Coordinate with OWNER to schedule installation including nights and weekends, <br /> to limit operational outages . <br /> 4 . Supply temporary plugs and thrust restraint, if piping is not available. <br /> PART 2 — PRODUCTS (NOT USED) <br /> PART 3 — EXECUTION <br /> 3 .01 GENERAL <br /> A. The CONTRACTOR shall coordinate construction and reconstruction work with the <br /> OWNER and ENGINEER Unless otherwise indicated, the CONTRACTOR shall be <br /> responsible for the sequence of the work All work shall be performed in accordance with <br /> i <br /> applicable safety rules and regulations. <br /> i <br /> ! B . The CONTRACTOR shall insure that any utilities connected to structures, equipment, and <br /> facilities to be removed, relocated, salvaged, replaced, or abandoned shall be rendered <br /> inoperable, replaced with new utilities, or adequately bypassed with temporary utilities <br /> I before proceeding with reconstruction. <br /> I C. The CONTRACTOR shall take precautions to avoid damage to adjacent facilities and to <br /> limit the reconstruction activities to the extent indicated. If reconstruction beyond the <br /> scope indicated is required, the CONTRACTOR shall obtain approval from the OWNER <br /> prior to commencing work <br /> 3 .02 DISPOSAL <br /> l <br /> 044572017 <br /> 01010-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.