My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:20:30 AM
Creation date
10/1/2015 12:34:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276B
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Supplementary Conditions
Area
South County RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C . Secure and deliver to the laboratory adequate quantities of representational samples of <br /> materials proposed to be used and which require testing. <br /> D . Provide to the laboratory the preliminary design mix proposed to be used for concrete , <br /> and other material mixes which require control by the testing laboratory . <br /> E . Materials and equipment used in the performance of work under this Contract are subject <br /> to inspection and testing at the point of manufacture or fabrication . Standard <br /> specifications for quality and workmanship are indicated in the Contract Documents . The <br /> Owner or Engineer may require the Contractor to provide statements or certificates from <br /> the manufacturers and fabricators that the materials and equipment provided by them are <br /> manufactured or fabricated in full accordance with the standard specifications for quality <br /> and workmanship indicated in the Contract Documents . All costs of this testing and <br /> providing statements and certificates shall be a subsidiary obligation of the Contractor, <br /> and no extra charge to the Owner shall be allowed on account of such testing and <br /> certification. <br /> F . Furnish incidental labor and facilities : <br /> 1 . To provide access to work to be tested <br /> 2 . To obtain and handle samples at the project site or at the source of the product to <br /> be tested <br /> 3 . To facilitate inspections and tests <br /> 4 . For storage and curing of test samples <br /> G . Notify laboratory, in advance of operations to allow for laboratory assignments of <br /> personnel and scheduling of tests. <br /> H. If the tests and any subsequent retests indicate the materials and equipment fail to meet <br /> the requirements of the Contract Documents, the Contractor shall pay for the laboratory <br /> costs directly to the testing firm, and these costs will not be reimbursable to the <br /> Contractor. <br /> PART 2 — PRODUCTS <br /> Not applicable. <br /> PART 3 — EXECUTION <br /> Not applicable . <br /> END OF SECTION <br /> I <br /> 044572017 <br /> 01410-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.