My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:20:30 AM
Creation date
10/1/2015 12:34:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276B
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Supplementary Conditions
Area
South County RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Testing Equipment: <br /> 1 . Calibrated at reasonable intervals by devices of accuracy traceable to either. <br /> a . National Bureau of Standards <br /> b . Accepted values of national physical constants . <br /> 1 .04 LABORATORY DUTIES <br /> A . Cooperate with Resident Project Representative and Contractor; provide qualified <br /> personnel after due notice . <br /> B . Perform specified inspections , sampling , and testing of materials and methods of <br /> construction : <br /> 1 . Comply with specified standards <br /> 2 . Ascertain compliance of materials with requirements of Contract Documents. <br /> C . Promptly notify Owner, Engineer and Contractor of observed irregularities or <br /> deficiencies of work or products . <br /> D . Promptly submit written report of each test and inspection; one copy each to Engineer, <br /> Owner , and Contractor, and one copy to Record Documents File . Each report shall <br /> include : <br /> 1 . Date issued <br /> 2 . Project title and number <br /> 3 . Testing laboratory name, address, and telephone number <br /> 4 . Name and signature of laboratory inspector <br /> 5 . Date and time of sampling or inspection <br /> 6 . Record of temperature and weather conditions <br /> 7 . Date of test <br /> 8 . Identification of product and specification section <br /> 9 . Location of sample or test in the Project <br /> 10 . Type of inspection or test <br /> 11 . Results of tests and compliance with Contract Documents <br /> 12 . Interpretation of test results, when requested by Engineer <br /> E. Perform additional tests as required by Engineer or the Owner. <br /> 1 .05 LIMITATIONS OF AUTHORITY OF TESTING LABORATORY <br /> A. Laboratory is not authorized to : <br /> 1 . Release, revoke, alter, or enlarge on requirements of Contract Documents <br /> 2 . Approve or accept any portion of the work <br /> 3 . Perform any duties of the Contractor <br /> 1 .06 CONTRACTOR' S RESPONSIBILITIES <br /> A. Employ and pay for the services of an independent testing laboratory. <br /> B . Cooperate with laboratory personnel, and provide access to work and to manufacturer' s <br /> facilities. <br /> 044572017 <br /> 01410-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.