Laserfiche WebLink
SECTION 01510 <br />1� ul' • i lMl 1�1 <br />PARTI-GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Furnish, install, and maintain temporary utilities required for construction; remove on <br />completion of entire project. <br />B. Provide temperature, ventilation, and lighting requirements, if applicable, as specified in <br />each individual section. <br />1.02 RELATED REQUIREMENTS <br />A. Summary of Work is included in Section 01010, <br />1.03 REQUIREMENTS OF REGULATORY AGENCIES <br />A. Comply with National Electric Code, <br />B. Comply with federal, state, and local codes and regulations, and with utility company <br />requirements. <br />PART 2 - PRODUCTS <br />2.01 MATERIALS (GENERAL) <br />Materials may be new or used, but must be adequate in capacity for the required usage. They <br />MUST NOT create unsafe conditions, and MUST NOT violate requirements of applicable codes <br />and standards. <br />2.02 TEMPORARY ELECTRICITY AND LIGHTING <br />A. The Contractor must maintain power to all existing buildings and areas. <br />B. The Contractor is responsible for providing and paying for all power required for his <br />operations. Contractor shall make arrangements with Owner for temporary power. <br />D. Provide POWER CENTERS for miscellaneous tools and equipment used in the work <br />1. Weatherproof distribution box with minimum of four 20 -amp., 120 -volt <br />grounded outlets. <br />2. Locate so that power is available at any point of use with minimum I00 -foot <br />CONSTRUCTION -TYPE power cords. <br />3. Provide circuit breaker protection for each outlet. <br />044572017 <br />01510-1 <br />