My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:20:30 AM
Creation date
10/1/2015 12:34:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276B
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Supplementary Conditions
Area
South County RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Provide adequate artificial lighting for all areas of work, when natural light is not <br /> adequate for work, and for areas accessible to persons other than Contractor' s employees . <br /> F . If Contractor requires service other than specified above , he shall arrange for, provide <br /> maintenance, and pay all costs incurred . <br /> 2 . 03 TEMPORARY AIR AND WATER <br /> Contractor shall make arrangements with Owner for all temporary water at the <br /> project site . Contractor shall pay for all temporary water required for his <br /> operations . The Contractor shall provide all air and water, including temporary <br /> piping and appurtenances required therefore, as may be required for the cleaning <br /> and testing of pipelines and equipment necessary the Work. Temporary piping <br /> and appurtenances shall be removed upon approval of equipment being tested. <br /> 2 .04 TEMPORARY SANITARY FACE.TTIES <br /> A. Contractor shall provide temporary sanitary facilities in compliance with laws and <br /> regulations . <br /> B . Contractor shall provide for regular service , cleaning, and maintenance of temporary <br /> facilities and enclosures . <br /> 2.07 FIRE EXTINGUISHERS <br /> A. Provide portable UL-rated, Class A fire extinguishers for temporary offices and similar <br /> spaces . In other locations, provide portable UL-rated Class ABC dry chemical <br /> extinguishers or a combination of NFPA recommended Classes for the exposure. <br /> Comply with NFPA 10 and 241 for classification, extinguishing agent and size required <br /> by location and class of fire exposure. <br /> 2.08 PROJECT SIGN <br /> A. Furnish and install the project sign as described in Section 01580. The sign shall be <br /> placed as directed by the Owner and shall remain in position for the life of the <br /> construction period. <br /> PART 3 - EXECUTION <br /> 3 .01 REMOVAL <br /> & Completely remove temporary materials and equipment when their use is no longer <br /> required. <br /> B . Clean and repair damage caused by temporary installations or use of temporary facilities. <br /> i <br /> C. Restore existing facilities used for temporary services to specified, or to original, <br /> condition. <br /> 044572017 <br /> 01510-2 <br /> I <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.