My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02065 <br /> DEMOLITION <br /> PART 1 - GENERAL <br /> 1 .01 SCOPE OF WORK <br /> A . The Contractor shall furnish all supervised labor, materials , equipment, and incidentals <br /> required for the removal of high service pumps (HSP) no . 1 , 2 , and 3 for installation of <br /> new HSP . <br /> B . The Contractor shall furnish all supervised labor, materials , equipment, and incidentals <br /> required for the partial removal of the existing chemical room wall . <br /> C. The Contractor shall furnish all supervised labor, materials , equipment, and incidentals <br /> required for the removal of any pavement, including base material, as shown on the <br /> construction plans . <br /> D . The Contractor shall furnish all supervised labor, materials, equipment, and incidentals <br /> required for the removal and the replacement of the existing roof panel of the <br /> hydrofluorosilicic storage area. <br /> Removal procedures are as outlined below : <br /> 1 . Complete or partial removal and disposal of specified existing piping, mechanical <br /> equipment, electrical equipment and miscellaneous appurtenances encountered <br /> during construction operations. <br /> 2 . Temporary modification of structures, equipment, appurtenances and utilities as <br /> necessary to allow for operation of the facilities during construction. <br /> 3 . Demolition, partial removal and cutting of existing concrete structure as required for <br /> the new construction. <br /> 1 4. Handling of existing equipment to be reinstalled or salvageable as specified. <br /> 5 . Off-site disposal of excess and unacceptable, materials including but not limited to <br /> I concrete, concrete blocks, and bricks . All materials to be disposed of in a legal <br /> I manner. <br /> I 6. This section may not cover all of the activities necessary to perform the work. The <br /> Contractor shall exercise due concern for the utility system operation and shall <br /> diligently direct all of the Contractor's activities toward maintaining continuous <br /> operation of the existing facilities and minimizing operation impacts. <br /> 1 .02 CONDITION OF STRUCTURES <br /> I <br /> 1 044572017 <br /> 02065 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.