Laserfiche WebLink
SECTION 02065 <br /> DEMOLITION <br /> PART 1 - GENERAL <br /> 1 .01 SCOPE OF WORK <br /> A . The Contractor shall furnish all supervised labor, materials , equipment, and incidentals <br /> required for the removal of high service pumps (HSP) no . 1 , 2 , and 3 for installation of <br /> new HSP . <br /> B . The Contractor shall furnish all supervised labor, materials , equipment, and incidentals <br /> required for the partial removal of the existing chemical room wall . <br /> C. The Contractor shall furnish all supervised labor, materials , equipment, and incidentals <br /> required for the removal of any pavement, including base material, as shown on the <br /> construction plans . <br /> D . The Contractor shall furnish all supervised labor, materials, equipment, and incidentals <br /> required for the removal and the replacement of the existing roof panel of the <br /> hydrofluorosilicic storage area. <br /> Removal procedures are as outlined below : <br /> 1 . Complete or partial removal and disposal of specified existing piping, mechanical <br /> equipment, electrical equipment and miscellaneous appurtenances encountered <br /> during construction operations. <br /> 2 . Temporary modification of structures, equipment, appurtenances and utilities as <br /> necessary to allow for operation of the facilities during construction. <br /> 3 . Demolition, partial removal and cutting of existing concrete structure as required for <br /> the new construction. <br /> 1 4. Handling of existing equipment to be reinstalled or salvageable as specified. <br /> 5 . Off-site disposal of excess and unacceptable, materials including but not limited to <br /> I concrete, concrete blocks, and bricks . All materials to be disposed of in a legal <br /> I manner. <br /> I 6. This section may not cover all of the activities necessary to perform the work. The <br /> Contractor shall exercise due concern for the utility system operation and shall <br /> diligently direct all of the Contractor's activities toward maintaining continuous <br /> operation of the existing facilities and minimizing operation impacts. <br /> 1 .02 CONDITION OF STRUCTURES <br /> I <br /> 1 044572017 <br /> 02065 - 1 <br />