My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. For pollution control, use sprinkling, temporary enclosures, and other suitable methods <br /> as necessary to limit the amount of dust and dirt rising and scattering in the air to the <br /> lowest level of air pollution practical for the conditions of work. Comply with the <br /> governing regulations . <br /> B . Clean adjacent structures and improvements of all dust, dirt , and debris caused by <br /> demolition operations . Return areas to conditions existing prior to the start of work . <br /> PART 2 - PRODUCTS <br /> A . Not Used <br /> PART 3 - EXECUTION <br /> 3 .01 REMOVAL OF EXISTING EQUIPMENT, PIPING AND APPURTENANCES <br /> A. Subject to the constraints of maintaining the existing utilities in operation; existing <br /> pumping equipment, valves , piping, and appurtenances not necessary for the operation of <br /> the new facility shall remain the property of the Owner unless otherwise directed by the <br /> Owner. The Contractor shall remove, clean, and prepare for storage all equipment to <br /> remain as directed by the Owner. If the Owner elects not to retain ownership of a certain <br /> item, the item shall become the property of the Contractor and shall be removed from the <br /> site at the Contractor's expense. <br /> B . All equipment and materials to be stored for reinstallation or salvage shall be properly <br /> protected from damage. <br /> C . Any items of equipment damaged or lost due to the Contractor's carelessness, <br /> mishandling, or faulty procedures and/or workmanship shall be repaired or replaced in <br /> Ikind to the satisfaction of the Engineer. <br /> END OF SECTION <br /> i <br /> 0445' 2017 <br /> 02065-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.