My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02670 <br /> FLUSHING , TESTING AND DISINFECTION <br /> PART 1 - GENERAL <br /> 1 .01 WORK INCLUDED <br /> A . Flushing, Pressure Testing, and Disinfection of systems including, but not limited to, raw <br /> water blend piping, all RO process equipment and piping where work performed, all high <br /> service pumps and piping, finished water piping, chemical system piping as listed herein. <br /> B . Contractor shall furnish all necessary pumps, hoses, piping, fittings, meters, gauges, <br /> chemicals and labor to conduct specified testing. <br /> C . Testing shall be repeated at the Contractor' s expense until satisfactory results are achieved. <br /> D . Refer the specific chemical system specification section for additional flushing and testing <br /> procedures . <br /> 1 .02 RELATED REQUIREMENTS SPECIFIED ELSEWHERE <br /> A. Section 11934 Series — High Service Pumps <br /> B . Section 15100 - Piping <br /> 1 .03 REFERENCES <br /> A. ANSI/AWWA C651 - Standard for Disinfecting Water Mains. <br /> B . ANSI/AWWA C652 — Standard for Disinfection of Water Storage-Facilities. <br /> C. ANSI/AWWA C653 — Standard for Disinfection of Water Treatment Plants. <br /> D . ANSI/AWWA C654 — Standard for Disinfection of Wells. <br /> 1 .04 SUBMITTALS <br /> A. Test Reports: Indicate results comparative to specified requirements. Submit two (2) copies <br /> of test results to Engineer in accordance with Submittal specifications. <br /> B . Final approval of the bacterial samples shall be received from the Florida Department of <br /> IEnvironmental Protection prior to the time that the system is placed into operation. Sampling <br /> procedures shall be done in accordance with FDEP requirements. <br /> I C. Bacteriological sampling locations shall meet FDEP requirements and be taken where shown <br /> on the drawings and as directed by the Engineer at no additional cost to Owner. Costs for all <br /> bacteriological testing shall be borne by the Contractor. <br /> 044572017 <br /> 02670- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.