My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 .05 QUALITY ASSURANCE <br /> A- Perform Work in accordance with ANSUAWWA C651 , C6521 C653 , and C654. <br /> 1 .06 REGULATORY REQUIREMENTS <br /> A. Conform to applicable Florida DEP requirements for performing the work of this Section . <br /> B . Work shall conform to Martin County Utility Standards . <br /> PART 2 - PRODUCTS <br /> 2 .01 DISINFECTION CHEMICALS <br /> A. Chemicals: The disinfecting agent shall be sodium hypochlorite solution ANSUAWWA <br /> B303 or liquid chlorine ANSUAWWA B301 . Dry hypochlorite, similar to " HTW or equal <br /> may also be used as the disinfecting agent. Bleach or Clorox is not acceptable. <br /> PART 3 - EXECUTION <br /> 3 .01 EXAMINATION <br /> A. Verify that pumps, piping systems, tanks, have been cleaned, inspected, and tested. <br /> B . Coordinate scheduling and disinfection activity with start-up, testing, demonstration <br /> proced»rss, -including coordination with related systems. <br /> 3 .02 FLUSHING AND PRESSURE TESTING - PIPING <br /> The Contractor shall furnish and install suitable temporary testing plugs or caps for the water lines, <br /> all necessary pressure pumps, hose, pipe connections, meters, gauges and other similar equipment, <br /> and all labor required all without additional compensation for conducting pressure and leakage tests <br /> and flushing of the new water lines. Flushing and pressure testing shall be conducted in the <br /> following order. <br /> A. After all piping lines have been installed and before pressure testing and final connections to <br /> equipment, each run of pipe shall be thoroughly flushed so as to remove all debris and <br /> foreign matter from the piping and equipment. Clean and flush all piping using potable <br /> water. Sufficient flushing water shall be introduced into the piping to produce a velocity of <br /> not less than 5 feet per second, and this rate of flow shall be continued until the discharge is <br /> clear and no evidence of silt or foreign matter is visible. Flushed water may be discharged to <br /> the onsite holding ponds and be coordinated with Owner. Contractor to provide means of <br /> discharging water to ponds at Contractor's expense. j <br /> Pigging of piping systems should be considered where flushing is not practical or feasible. <br /> Non-abrasive pigs shall be employed. <br /> I <br /> B . Pressure testing piping systems: <br /> 044572017 <br /> 02670-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.