My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2 — PRODUCTS <br /> 2 . 01 WOOD FORM MATERIALS <br /> A. Form Materials : At the discretion of the Contractor. <br /> 2 .02 FORMWORK ACCESSORIES <br /> A . Wall Form Ties : Removable Snap-off type, 316 stainless steel , fixed length, cone rvpe , <br /> with waterproofing rubber washer, 1 - 1 /2 inch back break dimension, free of deit, ,, utat <br /> could leave holes larger than 1 -inch in concrete surface . <br /> B . Form Release Agent: Colorless mineral oil which will not stain concrete, or absorb <br /> moisture, or impair natural bonding or color characteristics of coating intended for use on <br /> concrete . <br /> C . Corners Chamfer, wood strip type; 3/4 x 3/4 inch size; maximum possible lengths . <br /> D . Nails, Spikes , Lag Bolts, Through Bolts, Anchorages : Sized as required, of sufficient <br /> strength and character to maintain formwork in place while placing concrete. <br /> PART 3 — EXECUTION <br /> 3 .01 EXAMIldATION <br /> A. Verify lines, levels, and centers before proceeding with formwork. Ensure that dimensions <br /> agree with drawings. <br /> 3 .02 EARTH FORMS <br /> A. Earth forms are not permitted. <br /> 3 .03 ERECTION - FORMWORK <br /> A. Erect formwork, shoring, and bracing to achieve design requirements, in accordance with <br /> requirements of ACI 318 . <br /> B . Provide bracing to ensure stability of formwork Shore or strengthen formwork subject to <br /> overstressing by construction loads. <br /> C. Arrange and assemble formwork to permit dismantling and stripping. Do not damage <br /> concrete during stripping. Permit removal of remaining principal shores. <br /> D. Align joints and make watertight. Keep form joints to a minimum. <br /> 044572017 <br /> 03100-2 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.