Laserfiche WebLink
E . Obtain approval before framing openings in structural members which are not indicated <br /> on Drawings . <br /> F . Provide chamfer strips on external corners of all exposed concrete elements . <br /> 3 .04 APPLICATION - FORM RELEASE AGENT <br /> A . Apply form release agent on formwork in accordance with manufacturer's <br /> recommendations . <br /> B . Apply prior to placement of reinforcing steel , anchoring devices, and embedded items . <br /> C . Do not apply form release agent where concrete surfaces will receive special finishes <br /> applied coverings which are affected by agent . Soak inside surfaces of untreated forms <br /> with clean water. <br /> D . Keep surfaces coated prior to placement of concrete. <br /> 3 .05 INSERTS , EMBEDDED PARTS , AND OPENINGS <br /> A. Provide formed openings where required for items to be embedded in passing through <br /> concrete work. <br /> B . Locate and set in place items which will be cast directly into concrete. <br /> C . Coordinate with work of other sections in forming and placing openings, slots, regrets, <br /> recesses, sleeves, bolts, anchors, other inserts, and components of other Work. <br /> i <br /> D . Install accessories in accordance with manufacturer's instructions, straight, level, and <br /> plumb. Ensure items are not disturbed during concrete placement. <br /> E. Install waterstops continuous without displacing reinforcement. Heat seal joints watertight. <br /> Conform to manufacturers recommendations . <br /> F. Provide temporary ports or openings m formwork where required to facilitate cleaning and <br /> inspection. Locate openings at bottom of forms to allow flushing water to drain. <br /> I <br /> G. Close temporary openings with tight fitting panels, flush with inside face of forms, and <br /> neatly fitted so joints will not be apparent in exposed concrete surfaces. <br /> I <br /> 3 .06 FORM CLEANING <br /> A. Clean forms as erection proceeds, to remove foreign matter within fortes. <br /> B . Clean formed cavities of debris prior to placing concrete. <br /> J <br /> C. Use compressed air to remove remaining foreign matter. <br /> 3 .07 FORMWORK TOLERANCES <br /> I <br /> 044572017 <br /> 03100-3 <br />