Laserfiche WebLink
3. All equipment shall be stored fully lubricated with oil, grease, etc, unless <br />otherwise instructed by the manufacturer. <br />4. A copy of the manufacturees storage instructions shall be given to the Resident <br />Project Representative and shall be carefully studied by the Contractor and <br />reviewed with the Resident Project Representative by him_ These instructions <br />shall be carefully followed and a written record of this kept by the Contractor. <br />5. Moving parts shall be rotated a minimum of once weekly to insure proper <br />lubrication and to avoid metal -to -metal "welding". Upon installation of the <br />equipment, start the equipment, at least half load, once weekly for an adequate <br />period of time to ensure that the equipment does not deteriorate from lack of use. <br />6. Lubricants shall be changed upon completion of installation and as frequently as <br />required thereafter during the period between installation and acceptance. <br />Mechanical equipment to be used in the work, if stored for longer than ninety <br />days, shall have the bearings cleaned, flushed and lubricated prior to testing and <br />startup, at no additional cost to the Owner. <br />7. Prior to acceptance of the equipment, have the manufacturer inspect the <br />equipment and certify that its condition has not been detrimentally affected by the <br />long storage period. Such certifications by the manufacturer shall be deemed to <br />mean that the equipment is judged by the manufacturer to be in a condition equal <br />to that of equipment that has been shipped, installed, tested and accepted in a <br />minimum time period. As such, the manufacturer will guarantee the equipment <br />equally in both instances. If such a certification is not given, the equipment shall <br />be judged to be defective. It shall be removed and replaced at the Contractor's <br />expense. <br />A. For all major pieces of equipment, submit a warranty from the equipment manufacturer as <br />specified in Section 01740. <br />1.10 SPARE PARTS <br />A. Spare parts for certain equipment provided under Divisions 11, 14, 15, 16, and 17 have <br />been specified in the pertinent Sections. Collect and store all spare parts as required by the <br />manufacturer in accordance with Paragraph 1.08 above. In addition, famish to the <br />Engineer an inventory listing all spare parts, the equipment they are associated with, the <br />name and address of the supplier and the delivered cost of each item. Copies of actual <br />invoices for each item shall be furnished with the inventory to substantiate the delivered <br />cost. Deliver the spare parts to the Owner not later than 10 days prior to plant start-up. <br />1.11 GREASE, OIL AND FUEL <br />A� All grease, oil and fuel required for testingof equipment :nbe i :• with the <br />respectiveequipment.71heOwner shall be furnished vnth a year's supply of :• :• <br />lubricants including ::. and • • of the • :•• gnu • :• by the manufacturer <br />each itern of •uipment supplied under Divisions• and 17. <br />B, The Contractor shall be responsible for changing the oil in all drives and intamediate <br />drives of h. equipment break4n of equipment : no <br />event shall be any longer than dam weelm of operation, <br />044572017 <br />01610-5 <br />