E. All materials which, in the opinion of the Engineer, have become so damaged as to be <br /> unfit for the use intended or specified shall be promptly removed from the site of the work <br /> and the Contractor shall receive no compensation for the damaged material or its removal. <br /> F . Arrange storage in a manner to provide easy access for inspection . Make periodic <br /> inspections of stored products to assure that products are maintained under specified <br /> conditions and free from damage or deterioration . <br /> G . Protection after Installation <br /> 1 . Provide substantial coverings as necessary to protect installed products from <br /> damage from traffic and subsequent construction operations . Remove coveting <br /> when no longer needed . <br /> H . The Contractor shall be responsible for all material , equipment and supplies sold and <br /> delivered to the Owner under this Contract until final inspection of the work and <br /> acceptance thereof by the Owner. In the event any such material, equipment and supplies <br /> are lost, stolen, damaged, or destroyed prior to final inspection and acceptance, the <br /> Contractor shall replace same without additional cost to the Owner. <br /> I. Failure to take proper action on storage and handling of equipment supplied under this <br /> Contract within seven days after written notice to do so has been given, the Owner retains <br /> the right to correct all deficiencies noted in previously transmitted written notice and <br /> deduct the cost associated with these corrections from the Contract. These costs may be <br /> comprised of expenditures for labor, equipment usage, administrative, clerical, <br /> Engineering and any other costs associated with making the necessary corrections . <br /> 1 .07 SPECIAL TOOLS <br /> A. Manufacturers of equipment and machinery shall furnish an <br /> y special tools (including <br /> grease guns or other lubricating devices) required for normal adjustment, operations and <br /> maintenance, together with instructions for their use. Preserve and deliver to the Owner <br /> these tools and instructions in good order no later than 10 days prior to plant start-up . <br /> 1 .08 STORAGE AND HANDLING OF EQUIPMENT ON SITE <br /> A. Because of the long period allowed for construction, special attention shall be given to the <br /> storage and handling of equipment on site. As a minimum, the procedure outlined below <br /> shall be followed. <br /> 1 . Equipment shall not be shipped until approved by the Resident Project <br /> Representative. The intent of this requirement is to reduce on-site storage time <br /> prior to installation and/or operation. Under no circumstances shall equipment be <br /> delivered to the site more than one month prior to installation without written <br /> authorization from the Resident Project Representative. Operation and <br /> maintenance data as described in Section 01730 shall be submitted to the <br /> Engineer for review prior to shipment of equipment. <br /> 2. All equipment having moving parts such as gears, electric motors, etc, and/or <br /> instruments shall be stored in a temperature and humidity controlled building <br /> approved by the Resident Project Representative, until such time as the equipment <br /> is to be installed. <br /> 044572017 <br /> 01610-4 <br /> l <br />