My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Repair or replace concrete not properly placed or of the specified type- <br /> C . Unless the removal of a defective slab is required by the Engineer, defective surfaces, such <br /> as honeycomb , shall be cut out entirely until homogeneous concrete is met, even if it <br /> means going through the slab . <br /> D . Such areas shall be coated with an approved epoxy bonding material , which shall be <br /> applied in accordance with the manufacturer' s instruction, before damp packing the area <br /> with a mix consisting of one part of Portland cement and two parts of sand and fine gravel , <br /> epoxy and sand mix, or any combination of materials and mixes as the situation dictates in <br /> the opinion of the Engineer . <br /> E . The water content of the damp-pack material shall be such that a ball of the mix may be <br /> squeezed in the hand without bringing free water to the surface. <br /> F . Damp-pack material shall be tamped into place and finished to match adjacent concrete <br /> surfaces . <br /> G. Particular care shall be taken that no sagging of the material will occur. <br /> H . The bond between any two layers of damp-pack shall be improved through the use of an <br /> approved epoxy bond agent . <br /> I. Surfaces which have been damp-packed shall be kept continuously damp during and for a <br /> period of not less than seven days after completing the damp pack operation, by <br /> polyethylene coverings thoroughly taped to the original concrete surface in a manner that <br /> loss of moisture, evidence by lack of water droplets on the inside surface of the <br /> polyethylene, is avoided. If this moisture condition cannot be maintained, a continuous <br /> water cure may be required by the Engineer. <br /> J . Under no circumstances shall Contractor apply a plaster coat over the honeycomb areas to <br /> conceal the existence of the honeycomb in the concrete. <br /> K. Neither Embeco nor calcium chloride shall be used for filling honeycomb areas, nor shall <br /> they be mixed with damp-pack material. <br /> L. Any concrete with excess air entraining agent will be rejected. <br /> 3 .07 FIELD QUALITY CONTROL <br /> IA. Field inspection and testing will be performed under provisions of Section 01410 , <br /> I B . Maintain records of placed concrete items. Record date, location of pour, quantity, air <br /> temperature, and test samples taken. <br /> 3 .08 CURING <br /> A, Curing shall be by water method, continuous for 7 days unless otherwise noted. <br /> LB . Contractor shall use curing compounds for vertical surfaces . <br /> 044572017 <br /> 03300-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.