My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Fabrication procedure to conform to PCI MNL- 116. <br /> B . Maintain plant records and quality control program during production of precast <br /> members . Make records available upon request. <br /> C . Ensure reinforcing steel , anchors, inserts, plates, angles, and other cast-in items are <br /> embedded and located as indicated on shop drawings. <br /> D . Tension reinforcement tendons as required to achieve design load criteria . <br /> E Provide required openings with a dimension larger than 8 inches and embed <br /> accessories provided by other Sections , at indicated locations . <br /> F. Exposed Ends at Stressing Tendons : Fill mess with epoxy grout, trowel flush. <br /> 2 .05 FINISHES <br /> A. Ensure exposed-to-view finish surfaces of precast concrete members are uniform in color <br /> and appearance . <br /> B . Cure members under identical conditions to develop required concrete quality and <br /> minimize appearance blemishes such as non-uniformity, staining, or surface <br /> cracking. <br /> Co Architectural Finish (Finish C): Surface holes or bubbles over 1 /4 inch (6 mm) <br /> filled with matching cementitious paste, fins or protrusions removed and surface <br /> ground smooth. <br /> PART 3 - EXECUTION <br /> 3 .01 EXAMINATION <br /> A . Verify that site conditions are ready to receive work and field measurements are as shown <br /> on Drawings. <br /> 3 .02 PREPARATION <br /> A. Prepare support equipment for the erection procedure, temporary bracing, and induced <br /> loads during erection. <br /> 3 .03 ERECTION <br /> A. Erect members without damage to structural capacity, shape, or finish. Replace or repair <br /> damaged members. <br /> B . Align and maintain uniform horizontal and vertical joints as erection progresses. <br /> C. Maintain temporary emp racy bracing in place until final support is provided. Protect members from <br /> staining. <br /> 044572017 <br /> 034104 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.