My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E . The Engineer's decision regarding evaluation of substitutions shall be considered final and <br /> binding. Requests for time extensions and additional costs based on submission of, <br /> acceptance of, or rejection of substitutions will not be allowed . All approved substitutions <br /> will be incorporated into the Agreement by Change Order. <br /> 1 .06 CONTRACTOR'S REPRESENTATION <br /> A . In making formal request for substitution, Contractor represents that : <br /> 1 . He has investigated proposed product and has determined that it is equal to or <br /> superior in all respects to that specified . <br /> 2 . He will provide same warranties or bonds for substitution as for product specified . <br /> 3 . He will coordinate installation of accepted substitution into the Work, and will <br /> make such changes as may be required for the Work to be complete in all respects. <br /> 4 . He waives claims for additional costs caused by substitution which may <br /> subsequently become apparent. <br /> 5 . Cost data is complete and includes related costs under his Contract, but not: <br /> a . Costs under separate contracts. <br /> b . Engineer's costs for redesign or revision of Contract Documents. <br /> 1 .07 ENGINEER DUTIES <br /> A. Review Contractor's requests for substitutions with reasonable promptness. <br /> B . Notify Contractor, in writing, of decision to accept or reject requested substitution. <br /> PART 2 — PRODUCTS (NOT USED) <br /> PART 3 — EXECUTION (NOT USED) <br /> END OF SECTION <br /> 1 <br /> 1 <br /> i <br /> 044572017 <br /> 01610.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.