My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Plastic Pipe and Fiberglass Fabrications <br /> 1 . Interior <br /> System : Epoxy-Polyamide <br /> First Coat: Series 66 Hi -Build Epoxolme <br /> D . F . T_ (Mils) : 2 . 0 - 3 . 0 <br /> Second Coat : Series 73 , Endura-Shield <br /> D . F .T . (Mils) : 2 . 0 - 3 . 0 <br /> Total Coats : 2 . 0 <br /> Total D . F .T_ (Mils) : 4 . 0 <br /> 3 . Exterior (Degasifier, Ducting, Scrubber, etc . ) <br /> System : Epoxy/Polyurethane <br /> First Coat: Series 66, Hi-Build Expoxoline <br /> D .F.T. (Mils.) 2 . 0 - 3 ,0 <br /> Second Coat : Series 73 , Endura-Shield <br /> D .F .T. (Mils.) 2 ,0 - 3 .0 <br /> Total Coats : 2 .0 <br /> Min . D .F.T. (Mils. ) 5 .0 <br /> 2 .06 SCHEDULE OF COLORS : <br /> These colors are provided for painting of piping, which has modified and famished and <br /> installed. Not all piping listed may require painting. <br /> A. Liquid Piping. <br /> 1 . Potable water (finished) - safety blue <br /> 2 . Wastewater and Drains – dark Grey <br /> 3 , Sewer Water - olive green, to match existing <br /> 4 . Scale Inhibitor – green, to match existing <br /> ( 5 . Caustic – black, to match existing <br /> 6 . Acid – red, to match existing <br /> B . Electrical Conduits—Color to match background. <br /> PART 3 - EXECUTION <br /> 3 .01 FIELD OBSERVATION <br /> A. Verify that surfaces are ready to receive work as instructed by the product manufacturer. Do not <br /> paint over conditions detrimental to the formation of a durable paint bond and film. <br /> IB . Examine surfaces scheduled to be finished prior to commencement of work Report any <br /> condition that may potentially affect proper application. Do not proceed with the work until <br /> unsatisfactory conditions have been corrected. <br /> I <br /> 044572017 <br /> 09900-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.