Laserfiche WebLink
C. Plastic Pipe and Fiberglass Fabrications <br /> 1 . Interior <br /> System : Epoxy-Polyamide <br /> First Coat: Series 66 Hi -Build Epoxolme <br /> D . F . T_ (Mils) : 2 . 0 - 3 . 0 <br /> Second Coat : Series 73 , Endura-Shield <br /> D . F .T . (Mils) : 2 . 0 - 3 . 0 <br /> Total Coats : 2 . 0 <br /> Total D . F .T_ (Mils) : 4 . 0 <br /> 3 . Exterior (Degasifier, Ducting, Scrubber, etc . ) <br /> System : Epoxy/Polyurethane <br /> First Coat: Series 66, Hi-Build Expoxoline <br /> D .F.T. (Mils.) 2 . 0 - 3 ,0 <br /> Second Coat : Series 73 , Endura-Shield <br /> D .F .T. (Mils.) 2 ,0 - 3 .0 <br /> Total Coats : 2 .0 <br /> Min . D .F.T. (Mils. ) 5 .0 <br /> 2 .06 SCHEDULE OF COLORS : <br /> These colors are provided for painting of piping, which has modified and famished and <br /> installed. Not all piping listed may require painting. <br /> A. Liquid Piping. <br /> 1 . Potable water (finished) - safety blue <br /> 2 . Wastewater and Drains – dark Grey <br /> 3 , Sewer Water - olive green, to match existing <br /> 4 . Scale Inhibitor – green, to match existing <br /> ( 5 . Caustic – black, to match existing <br /> 6 . Acid – red, to match existing <br /> B . Electrical Conduits—Color to match background. <br /> PART 3 - EXECUTION <br /> 3 .01 FIELD OBSERVATION <br /> A. Verify that surfaces are ready to receive work as instructed by the product manufacturer. Do not <br /> paint over conditions detrimental to the formation of a durable paint bond and film. <br /> IB . Examine surfaces scheduled to be finished prior to commencement of work Report any <br /> condition that may potentially affect proper application. Do not proceed with the work until <br /> unsatisfactory conditions have been corrected. <br /> I <br /> 044572017 <br /> 09900-7 <br />