Laserfiche WebLink
2.06 <br />C. Plastic Pipe and Fiberglass Fabrications <br />1 <br />3 <br />Interior <br />System: <br />First Coat: <br />D.F.T_ (Mils): <br />Second Coat: <br />D.F.T. (Mils): <br />Total Coats: <br />Total D.F.T_ (Mils): <br />Epoxy-Polyamide <br />Series 66 Hi -Build Epoxolme <br />2.0-3.0 <br />Series 73, Endura -Shield <br />2.0-3.0 <br />2.0 <br />4.0 <br />Exterior (Degasifier, Ducting, Scrubber, etc.) <br />System: <br />First Coat: <br />D.F.T. (Mils.) <br />Second Coat: <br />D.F.T. (Mils.) <br />Total Coats: <br />Min. D.F.T. (Mils.) <br />SCHEDULE OF COLORS: <br />Epoxy/Polyurethane <br />Series 66, Hi -Build Expoxoline <br />2.0-3,0 <br />Series 73, Endura -Shield <br />2,0-3.0 <br />2.0 <br />5.0 <br />These colors are provided for painting of piping, which has modified and famished and <br />installed. Not all piping listed may require painting. <br />A. Liquid Piping. <br />1. Potable water (finished) - safety blue <br />2. Wastewater and Drains – dark Grey <br />3, Sewer Water - olive green, to match existing <br />4. Scale Inhibitor – green, to match existing <br />5. Caustic – black, to match existing <br />6. Acid – red, to match existing <br />B. Electrical Conduits—Color to match background. <br />PART 3 - EXECUTION <br />3.01 FIELD OBSERVATION <br />A. Verify that surfaces are ready to receive work as instructed by the product manufacturer. Do not <br />paint over conditions detrimental to the formation of a durable paint bond and film <br />B. Examine surfaces scheduled to be finished prior to commencement of work Report any <br />condition that may potentially affect proper application. Do not proceed with the work until <br />unsatisfactory conditions have been corrected. <br />044572017 <br />09900-7 <br />