Laserfiche WebLink
C. Provide all necessary equipment, labor, rigging, lighting and other equipment to facilitate <br /> inspections. <br /> D . The Engineer may inspect the Work at any time for compliance with the requirements of the <br /> specifications . <br /> E . The Engineer reserves the right to approve each phase of the Work before further work is done , <br /> to halt all Work deemed to be improper or not in compliance with the specification, and to <br /> require the Contractor to promptly correct all improper practices or deficient Work. <br /> F . The Contractor is responsible for any expenses incurred in association with corrective measures <br /> required as the result of improper practices and/or defective or deficient work. <br /> 3 .02 GENERAL REQUIREMENTS <br /> A. Provide adequate explosion - proof lighting sufficient to illuminate clearly the working area <br /> without shadows during all surface preparation and coating operations . <br /> B . Maintain adequate and continuous explosion - proof ventilation in confirmed areas during all <br /> surface preparation and coating operations and during all recoat and curing periods . Provide <br /> ventilation of sufficient capacity to maintain a clear atmosphere that is well below explosive and <br /> toxic limits. Arrange the ventilation system, including all fans and temporary duct work, so that <br /> no still air spaces exist in any area. <br /> C. Heating devices used to create and/or maintain temperature conditions in compliance with the <br /> specification requirements are to be explosion proof and of the type that do not exhaust sooty or <br /> oily residues or any other contaminants into the air. Heating devices are not to be used when <br /> existing temperature and humidity conditions may create dew point conditions. <br /> D . Use equipment that is explosion proof and non-sparking. Spray equipment must be <br /> recommended by or acceptable to the coatings manufacturer. <br /> E. Apply caulking material only after the last coat of paint has been applied and has dried hard. <br /> Caulking material used must be of a type that is compatible with the specified coating system. <br /> 3 .03 SURFACE PREPARATION <br /> A. Perform preparation and cleaning procedures in strict accordance with the paint manufacturer's <br /> instructions and as herein specified, for each particular substrate conditions. <br /> B . Surface preparation shall be conducted to prevent material from contaminating the existing water <br /> treatment process. <br /> D. Fiberglass and PVC materials shall be solvent cleaned according to SSPC-SP 1 and scarified by <br /> best practical means. Every precaution should be taken to ensure that NO sanding dust is drawn <br /> into the degasifiers. Painting contractor to fiunish all necessary barrier, drapes, etc. to prevent <br /> contamination of the Finish Water. 1 <br /> 044572017 <br /> 09900-8 <br />