My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Clean and prime unprimed ferrous metals as soon as possible after delivery of the metals <br /> to the job site. <br /> 3 . Recoat primed and sealed surfaces where there is evidence of suction spots or unsealed <br /> areas in fust coat, to assure a finish coat with no burn -through or other defects due to <br /> insufficient sealing. <br /> E . Completed Work <br /> 1 . Match approved samples for color, texture and coverage. <br /> 2 . Remove , refinish or repaint work not in compliance with specified requirements. <br /> F. Dry Film Gauge <br /> 1 . Provide "Noroson Magnetic Dry Film Thickness Gauge" as supplied by the coatings <br /> manufactured . <br /> 3 .06 CLEAN-UP AND PROTECTION <br /> A. Clean-up <br /> 1 . During the progress of the work, remove from the site all discarded paint materials, <br /> rubbish, cans and rags at the end of each work day. <br /> 2 . Upon completion of painting work, clean window glass and other paint - spattered <br /> surfaces. Remove spattered paint by proper methods of washing and scraping, using care <br /> not to scratch or damage finished surfaces . <br /> B . Protection <br /> I <br /> 1 . Protect open water holding tanks and basins of the existing water treatment plant. <br /> i <br /> 2. Protect work of other trades, whether to be painted or not, against damage from painting <br /> and finishing work. <br /> 3 . Protect surfaces that might otherwise be damaged by dripping, splashing, or spraying of <br /> paint. Correct any damage by cleaning, repairing or replacing and repainting as <br /> acceptable to the Engineer. <br /> 4. Provide Wet Paint signs as required to protect newly painted finishes. Remove <br /> temporary protective wrappings provided by others for protection of their work, after the <br /> completion of paint operations . <br /> i <br /> 5 . At the completion of work of other trades, touch-up and restore all damaged or defaced <br /> painted surfaces. <br /> 6 . Repair of damage caused by overspray is the contractor's responsibility. <br /> 044572017 <br /> 09900- 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.