My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 .07 WARRANTY <br /> A. If within one year after the date of Substantial Completion, any Work is found to be defective, <br /> CONTRACTOR shall promptly, without cost to OWNER and in accordance with OWNER' S <br /> written instructions, either correct such defective Work, or, if it has been rejected by OWNER, <br /> remove it from the site and replace it with nondefective Work. If CONTRACTOR does not <br /> promptly comply with terns of such instructions , or in an emergency where delay would cause <br /> serious risk of loss or damage , OWNER may have the defective Work corrected or the rejected <br /> Work removed and replaced , and all direct and indirect costs of such removal and replacement, <br /> including compensation for additional professional services, will be charged to the <br /> CONTRACTOR. <br /> END OF SECTION <br /> (Remainder of This Page Intentionally Left Blank) <br /> 044572017 <br /> 09900- 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.