Laserfiche WebLink
2. PVC schedule 80 shall meet the requirements of ASTM standard D 17 85 for physical <br />dimensions and tolerances. <br />3. The marking on PVC Schedule 80 pipe shall meet the requirements of ASTM D1785 <br />and state the material designation code, nominal pipe size, schedule of pipe, pressure <br />rating in psi for water at 73° F., the ASTM designation number D1785 and the NSF <br />seal for potable water. <br />4. Fittings used shall be PVC Schedule 80 and solvent welded in accordance with ASTM <br />D1785. <br />5. Small Diameter PVC Pipe: PVC pipe smaller than 4 -inch shall be schedule 80 PVC <br />plastic pipe with solvent weld fittings in accordance with ASTM D-1785. <br />6. PVC Drain Pipe: PVC drain pipe shall be PVC sewer pipe and fittings, ASTM D- <br />2729. <br />7. All underground sodium hypochlorite piping shall maintain constant slope as indicated <br />on drawings. Provide top of pipe elevations every ten (10) -feet. Verify with <br />Engineer. <br />B. Containment Piping <br />1. The pipe and fittings shall be of the same material for both the primary and secondary <br />piping. The primary piping shall be Sch. 80 and that secondary pipe may be Sch. 40. <br />2. Containment piping shall have centralizers and non -split, containment fitting <br />termination test plugs with test port on secondary pipe. <br />3. Containment piping to have rectangular FRP or PVC sumps with bolt down lid as <br />indicated on the Contract Drawings. Sumps must be of sufficient depth to allow <br />installation of secondary pipe drain valve and temporary connection of evacuation <br />PUMP, <br />4. Primary piping to be tested to 150 psig for 1 hour without any pressure drop (less than <br />2%). Any leaks, visual or test failure shall be corrected at no cost to the Owner. After <br />the primary piping pressure is successfully completed, the Secondary containment <br />shall be pressure tested to 20 psi with less than 5% loss over 1 hour. During the <br />secondary piping pressure test, the primary pipe shall remain full and pressurized to a <br />minimum of 30 psi. <br />2.06 SULFURIC ACID AND ZINC ORTHO SYSTEM PIPING AND VALVES <br />A. All piping and pipe fittings shall be Schedule 80 CPVC in the appropriate diameters, in <br />accordance with the piping section of these specifications and the drawings. <br />Tubing used to connect the pump ports to the suction and discharge headers shall be <br />manufactured from PFA. Tube fittings shall be constructed from PFA and manufactured by <br />Whitey, or equal. All fittings material must be compatible with 93% - 98% sulfuric acid by <br />weight. <br />044572017 <br />15100-6 <br />