Laserfiche WebLink
I. All conduits on exposed work shall be run at right angles to and parallel with the surrounding <br />wall or slab. No diagonal runs will be allowed. Bends in parallel conduit runs shall be <br />concentric. All conduits shall be run perfectly straight and true. <br />J. Conduit stub outs for future construction shall be provided with threaded PVC end caps at each <br />end. <br />K. All earth, sod, etc., moved during the installation of underground conduit shall be replaced by the <br />contractor to its original state. <br />L. Conduits terminating in gasketed enclosures shall be terminated with conduit hubs. <br />M. All conduits terminating through concrete shall be painted with bitumastic from 6 inches below to <br />6 inches above slab. <br />N. All exposed, outdoor PVC conduits and boxes shall be painted with two (2) coats of silver paint. <br />O. The ends of all conduits terminating in panels, cabinets, and equipment shall be filled with <br />silicone gel. Filling shall be done after the cable has been pulled in order to prevent moisture and <br />insects in the terminating enclosure. <br />END OF SECTION <br />044572017 <br />16110- 3 <br />