My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> D . Housekeeping pads shall be provided for the motor control centers . <br /> E. Install the equipment in accordance with the manufacturers instructions . <br /> F . Remove temporary lifting angles, lugs and shipping braces. Touch-up damaged paint finishes . <br /> G . Make wiring interconnections between shipping splits . <br /> H . Install bus splice plates and torque connections . <br /> I . No operator devices shall be located over 6 ft . 6 in . above the operating floor . Circuit breaker <br /> operating handles located more than 6 ft . 6 in . above the operating floor shall have operating <br /> arm extensions . <br /> 3 .02 FIELD TESTING <br /> A. Make the following minimum tests and checks before the manufacturer's representative is <br /> called in for testing and adjustment. <br /> 1 . Megger incoming line terminals and buses, phase-to-phase and phase-to-ground after <br /> disconnecting devices sensitive to megger voltage . <br /> 2 . Remove current transformer shunts after completing secondary circuit. Check polarity and <br /> continuity of metering and relaying circuits. <br /> 3 . Check mechanical interlocks for proper operation. <br /> 4 . Test ground connections for continuity and resistance. <br /> i5 . Adjust unit compartment doors . <br /> 6 . Check control circuit interlocking and continuity with starters in the TEST position . <br /> Provide external source of control power for this test. <br /> 7 . Adjust motor circuit protectors and voltage trip devices to their correct settings. <br /> i8 . Install overload heaters for actual motor nameplate currents. <br /> B . In the event of an equipment fault, the cause of the fault shall be identified and corrected, . a <br /> joint inspection of the equipment shall be conducted by the Contractor, Owner' s <br /> l Representative, Owner and the equipment manufacturers factory service technician. <br /> I3 .03 ADJUSTMENT <br /> A. The motor control center manufacturer shall provide the services of a factory trained service <br /> t technician for start-up and training of the Owner's personnel . The first trip shall be coordinated <br /> with the equipment start-up . The second trip shall include any necessary follow-up or punch list <br /> work and shall also include instructions to the Owner or to his/her designated personnel. The <br /> manufacturer's service technician shall demonstrate and test all operational features of the <br /> installed equipment to the satisfaction of the Owner. <br /> 044572017 <br /> I 16480-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.