Laserfiche WebLink
D. Housekeeping pads shall be provided for the motor control centers. <br />E. Install the equipment in accordance with the manufacturers instructions. <br />F. Remove temporary lifting angles, lugs and shipping braces. Touch-up damaged paint finishes. <br />G. Make wiring interconnections between shipping splits. <br />H. Install bus splice plates and torque connections. <br />I. No operator devices shall be located over 6 ft. 6 in. above the operating floor. Circuit breaker <br />operating handles located more than 6 ft. 6 in. above the operating floor shall have operating <br />arm extensions. <br />3.02 FIELD TESTING <br />A. Make the following minimum tests and checks before the manufacturer's representative is <br />called in for testing and adjustment. <br />1. Megger incoming line terminals and buses, phase -to -phase and phase -to -ground after <br />disconnecting devices sensitive to megger voltage. <br />2. Remove current transformer shunts after completing secondary circuit. Check polarity and <br />continuity of metering and relaying circuits. <br />3. Check mechanical interlocks for proper operation. <br />4. Test ground connections for continuity and resistance. <br />5. Adjust unit compartment doors. <br />6. Check control circuit interlocking and continuity with starters in the TEST position. <br />Provide external source of control power for this test. <br />7. Adjust motor circuit protectors and voltage trip devices to their correct settings. <br />8. Install overload heaters for actual motor nameplate currents. <br />B. In the event of an equipment fault, the cause of the fault shall be identified and corrected,.a <br />joint inspection of the equipment shall be conducted by the Contractor, Owner's <br />l Representative, Owner and the equipment manufacturers factory service technician. <br />I3.03 ADJUSTMENT <br />A. The motor control center manufacturer shall provide the services of a factory trained service <br />t technician for start-up and training of the Owner's personnel. The first trip shall be coordinated <br />with the equipment start-up. The second trip shall include any necessary follow-up or punch list <br />work and shall also include instructions to the Owner or to his/her designated personnel. The <br />manufacturer's service technician shall demonstrate and test all operational features of the <br />installed equipment to the satisfaction of the Owner. <br />044572017 <br />I 16480-7 <br />