My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Instrumentation and Metering <br /> 1 . Elapsed time hour meters : Five digit, non-reset type, with 120 Volt synchronous motor. <br /> E. Relays and Timers <br /> 1 . Control relays and timers : Heavy duty machine tool type, with 10 Amps, 600 Volt <br /> convertible contacts, General Electric Co. , CR 120 Series ; Cutler Hammer/Westinghouse, <br /> Type M -600 ; Square D, Type X or equal . Provide pneumatic timing or latching <br /> attachments as required . <br /> 2 . Panel mounted timers shall be the flush mounted , plug- in type, Eagle Signal , Bulletin 125 <br /> Cycle-Flex or equal . <br /> F . Pilot Devices <br /> 1 . Control operators : Heavy duty, full size, oiltight, with NEMA A600 contact rating. <br /> 2 . Indicator lights: Full size, oiltight, low voltage, LED type, with push-to-test feature . <br /> 2 .04 SURFACE PREPARATION AND SHOP COATINGS <br /> A. All non-current carrying metal parts of the control center assembly shall be cleaned of all weld <br /> spatter and other foreign material and given a heat cured, phosphatized chemical pre-treatment <br /> to inhibit rust. <br /> B . Unpainted non-current carrying parts shall receive a protective zinc plating to prevent <br /> corrosion. <br /> C. Indoor equipment shall be finish painted with one coat of manufacturers standard electrocoated, <br /> heat cured enamel . Color shall be ANSI49 or 61 light grey. <br /> 2.05 SHOP TESTING <br /> A. Perform manufacturers standard production testing and inspection in accordance with NEMA <br /> and ANSI standards. <br /> PART 3 EXECUTION <br /> 3 .01 INSTALLATION <br /> A. Motor control center floor sills shall be bolted directly to the finished floor or equipment pad. <br /> Structure shall be leveled and plumb. Anchor bolts shall be flinch (minimum) . Provide <br /> hardware and shims for installation. <br /> B . Field installed interior wiring shall be neatly grouped by circuit and bound by plastic tie wraps. <br /> Circuit groups shall be supported so that circuit terminations are not stressed. <br /> C . In general , all conduit entering or leaving a motor control center shall be stubbed up into the <br /> bottom horizontal wireway directly below the vertical section in which the conductors are to be <br /> terminated, or shall enter the motor control center from the top . <br /> 044572017 <br /> 16480-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.