My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 16483 <br /> 150 HP VARIABLE FREQUENCY DRIVES (VFDs) <br /> PARTI - GENERAL <br /> 1 . 01 SCOPE OF WORK <br /> A . The Supplier shall furnish, test, and place in satisfactory operation, three (3 ) complete variable <br /> frequency drive systems, with all spare parts , accessories , and appurtenances as specified herein, <br /> all in accordance with the requirements of the Contract Documents . <br /> 1 .02 SUBMITTALS <br /> A. Submit Shop Drawings in accordance with the requirements of the Contract Documents . Shop <br /> Drawings shall include the following : <br /> 1 . Complete variable frequency drive data including dimensions , weights , and detailed <br /> performance information, including heat contribution to the environment. <br /> 2 . Enclosure outline Drawings showing dimensions and weight. These shall include a dead- <br /> front panel elevation showing all devices and nameplates : <br /> 3 . Catalog cut and catalog data for all equipment and devices. <br /> 4 . Complete wiring diagrams, elementary or control schematics, including coordination with <br /> other electrical control devices operating in conjunction with the speed controller and <br /> suitable outline . Drawings shall be furnished for review before proceeding with <br /> manufacturing . Due to the complexity of the control functions, it is imperative that the <br /> above Drawings be clear and carefully prepared to facilitate interconnections with other <br /> equipment. Clearly differentiate between portions of wiring which are Manufacturer <br /> installed and portions which are field installed. Standard preprinted sheets or Drawings <br /> marked to indicate applicability to this contract will not be acceptable. <br /> 5 . Any exception to this Specification along with detailed justification for each exception. <br /> All items shall be in hold letters and underlined. <br /> 6 . VFD manufacturer's statement accepting two (2) years warranty responsibility. <br /> 7 . Copies of a preliminary O&M manual . <br /> ( 8 . A list of the Manufacturer's recommended special tools and spare parts to be supplied. <br /> Spare parts lists, included with the shop Drawing submittal shall indicate specific sizes, <br /> quantities, and part numbers of the items to be furnished. <br /> B . Submit copies of all factory test results to the Engineer for review and approval prior to shipment <br /> ' of each VFD . The number of copies of the test reports shall be the same as required for Shop <br /> Drawing submittals. <br /> l <br /> 044572017 <br /> 16483 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.